AnsweredAAbutPierQ&A #2060752007-09-03 19:50 · Views 23

N-value at pile head

말뚝머리 N치가 이상한거 같아서 올립니다. 봐주십시오!

Answer

안녕하세요. 한길아이티입니다. 지반정보-말뚝지반정보자동설정을 off하신후 기초부설정입력에서 bN을 수동입력하시면 계산서에 적용이 됩니다. 자동설정인경우 말뚝두부의 N치를 사용하게 됩니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#206112Request to check pier cap dimensions and column tie bar layout312007-09-06
AnsweredAAbutPier#206111Widening at pier center in R bridge312007-09-06
AnsweredAAbutPier#206109Superelevation calculation program error112007-09-06
AnsweredAAbutPier#206113Post 29526 resolved522007-09-05
AnsweredAAbutPier#206110Not recognized312007-09-05
AnsweredAAbutPier#206107Question about seismic design402007-09-05
AnsweredAAbutPier#206102Why the foundation analysis does not run352007-09-05
AnsweredAAbutPier#206100Why the seismic analysis does not run?242007-09-05
AnsweredAAbutPier#206096Reinforcement not entered when using two layers of main rebar in abutment footing heel242007-09-05
AnsweredAAbutPier#206095Why the seismic analysis does not run?252007-09-05
AnsweredAAbutPier#206091Attaching the file below192007-09-04
AnsweredAAbutPier#206080About bearings392007-09-04
AnsweredAAbutPier#206068Shouldn't the larger value be applied for superstructure inertia (horizontal) force?742007-09-04
AnsweredAAbutPier#206063Inquiry about pier end beam dimensions (bearing locations)142007-09-03
AnsweredAAbutPier#206060Bridge bearing horizontal force is too large402007-09-03
AnsweredAAbutPier#206078Manual input262007-09-03
AnsweredAAbutPier#206075N-value at pile head · Currently viewing232007-09-03
AnsweredAAbutPier#206054Error when creating sapdata for seismic analysis392007-09-03
AnsweredAAbutPier#206073New employee of 4 months482007-09-03
AnsweredAAbutPier#206059Quantity calculation report342007-09-03
Sign in to ask