Inquiry about pier end beam dimensions (bearing locations)
1. Pier부 : 단면도제원에서는 받침위치가 잘 나온것 같은데...두부보제원의 받침위치가 이상합니다. 2. Abut부 : 날개벽에서 수평철근이 표시가 되지 않습니다. 검토부탁드립니다.
Answer
안녕하세요. 한길아이티입니다. 1.단면도제원에서 설정하신 형식은 T형교각이 아니라 벽식교각이므로 교각설계환경-설계조건-교각형식을 T형교각->벽식교각으로 변경후 교각단면조제원에서 TL=TB=0,HL1,HL2=0,CL=0으로 입력하셔야지 벽식교각으로 설정하시게 되는것입니다. 2.올려주신 화일과 같이 날개벽을 본체측면에 부착시킨후 날개벽제원에서 "날개벽을 본체측면에 부착"을 on하신후 작업을 하셔야 합니다. 1,2번작업을 한화일을 올려드리니 참고하시기 바랍니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #206112 | Request to check pier cap dimensions and column tie bar layout | 31 | 2007-09-06 |
| Answered | AAbutPier | #206111 | Widening at pier center in R bridge | 31 | 2007-09-06 |
| Answered | AAbutPier | #206109 | Superelevation calculation program error | 11 | 2007-09-06 |
| Answered | AAbutPier | #206113 | Post 29526 resolved | 52 | 2007-09-05 |
| Answered | AAbutPier | #206110 | Not recognized | 31 | 2007-09-05 |
| Answered | AAbutPier | #206107 | Question about seismic design | 40 | 2007-09-05 |
| Answered | AAbutPier | #206102 | Why the foundation analysis does not run | 35 | 2007-09-05 |
| Answered | AAbutPier | #206100 | Why the seismic analysis does not run? | 24 | 2007-09-05 |
| Answered | AAbutPier | #206096 | Reinforcement not entered when using two layers of main rebar in abutment footing heel | 24 | 2007-09-05 |
| Answered | AAbutPier | #206095 | Why the seismic analysis does not run? | 25 | 2007-09-05 |
| Answered | AAbutPier | #206091 | Attaching the file below | 19 | 2007-09-04 |
| Answered | AAbutPier | #206080 | About bearings | 39 | 2007-09-04 |
| Answered | AAbutPier | #206068 | Shouldn't the larger value be applied for superstructure inertia (horizontal) force? | 74 | 2007-09-04 |
| Answered | AAbutPier | #206063 | Inquiry about pier end beam dimensions (bearing locations) · Currently viewing | 14 | 2007-09-03 |
| Answered | AAbutPier | #206060 | Bridge bearing horizontal force is too large | 40 | 2007-09-03 |
| Answered | AAbutPier | #206078 | Manual input | 26 | 2007-09-03 |
| Answered | AAbutPier | #206075 | N-value at pile head | 23 | 2007-09-03 |
| Answered | AAbutPier | #206054 | Error when creating sapdata for seismic analysis | 39 | 2007-09-03 |
| Answered | AAbutPier | #206073 | New employee of 4 months | 48 | 2007-09-03 |
| Answered | AAbutPier | #206059 | Quantity calculation report | 34 | 2007-09-03 |