Maximum rebar ratio check formula is applied incorrectly
접속슬래브나 날개벽설계시 최대철근비 검토식이 다음과 같이 이상하게 들어옵니다.. "ρmax = 0.75 x ρb = 0.75 x k1 x Φx (fck / fy) x {60 / (60 + fy)}" 계수값이 60으로 들오는데 이유를 잘 모르겠습니다.. 화면 캡쳐해서 그림파일과 같이 올립니다.. 빠른 답변 부탁드립니다..
Answer
안녕하세요. 한길아이티입니다. 올려주신 화일에서 입력수치를 조정하시기 바랍니다. 기초자료-설계환경-Es:철근의 탄성계수,Es:강재의 탄성계수에 대한 수치가 설계기준과 상이합니다. 20000->200000,21000->210000으로 변경하시기 바랍니다. 참고로 수정된 화일을 올려드리니 참고하시기 바랍니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #205829 | Drawing text | 77 | 2007-08-17 |
| Answered | AAbutPier | #205831 | When will the MASS foundation sliding check be updated? | 62 | 2007-08-17 |
| Answered | AAbutPier | #205826 | About the foundation | 60 | 2007-08-17 |
| Answered | AAbutPier | #205825 | Question about live load in bearing area check | 80 | 2007-08-17 |
| Answered | AAbutPier | #205823 | Horizontal force calculation | 55 | 2007-08-17 |
| Answered | AAbutPier | #205819 | Please merge two files | 73 | 2007-08-17 |
| Answered | AAbutPier | #205812 | Additional pier file | 61 | 2007-08-17 |
| Answered | AAbutPier | #205810 | Question about the number of bearings | 33 | 2007-08-16 |
| Answered | AAbutPier | #205809 | Earth pressure calculation error in MASS foundation stability check | 39 | 2007-08-16 |
| Answered | AAbutPier | #205808 | Quantity (rebar) | 40 | 2007-08-16 |
| Answered | AAbutPier | #205805 | Errors in pier column reinforcement detailing and coping | 51 | 2007-08-16 |
| Answered | AAbutPier | #205794 | Pier modeling analysis error | 32 | 2007-08-14 |
| Answered | AAbutPier | #205792 | Maximum rebar ratio check formula is applied incorrectly · Currently viewing | 37 | 2007-08-14 |
| Answered | AAbutPier | #205789 | Cannot enter cover thickness | 62 | 2007-08-14 |
| Answered | AAbutPier | #205786 | About entering the unit weight of embankment material | 29 | 2007-08-14 |
| Answered | AAbutPier | #205781 | Internal error during pile check | 22 | 2007-08-14 |
| Answered | AAbutPier | #205770 | When applying stepped rebar to a pier | 46 | 2007-08-14 |
| Answered | AAbutPier | #205764 | Cannot enter the number of columns in pier section dimensions | 37 | 2007-08-13 |
| Answered | AAbutPier | #205763 | Please check the pile layout | 29 | 2007-08-13 |
| Answered | AAbutPier | #205759 | Uploading captured images and file | 40 | 2007-08-13 |