Internal error during pile check

수고하십니다. 첨부한 화일에서 교각4 에서 말뚝검토시 내부응용프로그램 오류가 나옵니다. 검토부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 교각설계환경-사용하중조합,계수하중조합,계수하중조합(최대편심)에 하중조합이 정의되어 있지 않읍니다. 권고안 실행후 설정값을 확인하시기 바랍니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#205829Drawing text772007-08-17
AnsweredAAbutPier#205831When will the MASS foundation sliding check be updated?622007-08-17
AnsweredAAbutPier#205826About the foundation602007-08-17
AnsweredAAbutPier#205825Question about live load in bearing area check802007-08-17
AnsweredAAbutPier#205823Horizontal force calculation552007-08-17
AnsweredAAbutPier#205819Please merge two files732007-08-17
AnsweredAAbutPier#205812Additional pier file612007-08-17
AnsweredAAbutPier#205810Question about the number of bearings332007-08-16
AnsweredAAbutPier#205809Earth pressure calculation error in MASS foundation stability check392007-08-16
AnsweredAAbutPier#205808Quantity (rebar)402007-08-16
AnsweredAAbutPier#205805Errors in pier column reinforcement detailing and coping512007-08-16
AnsweredAAbutPier#205794Pier modeling analysis error322007-08-14
AnsweredAAbutPier#205792Maximum rebar ratio check formula is applied incorrectly372007-08-14
AnsweredAAbutPier#205789Cannot enter cover thickness622007-08-14
AnsweredAAbutPier#205786About entering the unit weight of embankment material292007-08-14
AnsweredAAbutPier#205781Internal error during pile check · Currently viewing222007-08-14
AnsweredAAbutPier#205770When applying stepped rebar to a pier462007-08-14
AnsweredAAbutPier#205764Cannot enter the number of columns in pier section dimensions372007-08-13
AnsweredAAbutPier#205763Please check the pile layout292007-08-13
AnsweredAAbutPier#205759Uploading captured images and file402007-08-13
Sign in to ask