Edited drawing frame file differs from the original
작업한 도각파일이 이상합니다. 검토 바랍니다. 수고하세요~~
Answer
안녕하세요. 한길아이티입니다. 작업중인 apr화일도 올려주시기 바랍니다. 참고로 다른 apr에서 출력한 도면입니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #205009 | Abutment superelevation | 28 | 2007-07-03 |
| Answered | AAbutPier | #205008 | About initial launch | 23 | 2007-07-03 |
| Answered | AAbutPier | #205003 | In quantity calculation | 13 | 2007-07-03 |
| Answered | AAbutPier | #204999 | Horizontal force in support analysis | 30 | 2007-07-03 |
| Answered | AAbutPier | #204992 | Abutment wall main rebar detailing looks wrong | 25 | 2007-07-03 |
| Answered | AAbutPier | #204991 | Please check wing wall reinforcement detailing | 40 | 2007-07-03 |
| Answered | AAbutPier | #204988 | Elastic support capacity | 30 | 2007-07-02 |
| Answered | AAbutPier | #204971 | Compatibility of existing work files with brx | 30 | 2007-07-02 |
| Answered | AAbutPier | #204968 | Seismic analysis error, please review data | 45 | 2007-07-02 |
| Answered | AAbutPier | #204989 | Whether axial force is included in seismic analysis | 51 | 2007-07-02 |
| Answered | AAbutPier | #204985 | Edited drawing frame file differs from the original · Currently viewing | 62 | 2007-07-02 |
| Answered | AAbutPier | #204967 | Edge distance check is not shown | 23 | 2007-06-30 |
| Answered | AAbutPier | #204966 | Approach slab rebar reinforcement drawing | 20 | 2007-06-30 |
| Answered | AAbutPier | #204954 | Pile check for wall-type pier | 44 | 2007-06-30 |
| Answered | AAbutPier | #204952 | Longitudinal variable section handling for pier cap | 28 | 2007-06-30 |
| Answered | AAbutPier | #204946 | Please review | 14 | 2007-06-30 |
| Answered | AAbutPier | #204934 | Error in modeling | 40 | 2007-06-29 |
| Answered | AAbutPier | #204923 | Pier display error | 56 | 2007-06-29 |
| Answered | AAbutPier | #204948 | Please check this | 22 | 2007-06-29 |
| Answered | AAbutPier | #204922 | Report page error | 27 | 2007-06-29 |