Skip to content
AnsweredAAbutPierQ&A #2044962007-06-14 17:16 · Views 75

Excel

엑셀

Answer

안녕하세요. 한길아이티입니다. 보내주신 엑셀과 같이 el을 산출하고자 한다면 apier화일에서 다음사항을 수정하셔야 합니다. 교량받침위치입력에서 H1:3150 -> 3100 슬래브제원입력에서 기준두께위치를 0 -> -800으로 수정하셔야 합니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#204517Seismic horizontal force on abutments of a single-span bridge392007-06-15
AnsweredAAbutPier#204526Follow-up: horizontal force calculation for single-span bridge582007-06-15
AnsweredAAbutPier#204493Please check EL calculation42007-06-15
AnsweredAAbutPier#204479Please reply382007-06-14
AnsweredAAbutPier#204472Marking error in wing wall output292007-06-14
AnsweredAAbutPier#204468Please check seismic horizontal force572007-06-14
AnsweredAAbutPier#204496Excel · Currently viewing752007-06-14
AnsweredAAbutPier#204476Bearing seat location362007-06-14
AnsweredAAbutPier#204460Question342007-06-14
AnsweredAAbutPier#204452Error in seismic analysis512007-06-14
AnsweredAAbutPier#204433Dimension mismatch between plan and front view442007-06-13
AnsweredAAbutPier#204425Calculating parapet wall height352007-06-13
AnsweredAAbutPier#204453When loading a brx file422007-06-13
AnsweredAAbutPier#204436***292007-06-13
AnsweredAAbutPier#204410Modeling analysis error (reposted)212007-06-13
AnsweredAAbutPier#204404Modeling analysis error392007-06-13
AnsweredAAbutPier#204379Can an alignment file be extracted from existing data?312007-06-12
AnsweredAAbutPier#204401Please take a look342007-06-12
AnsweredAAbutPier#204383Please review wing wall check402007-06-12
AnsweredAAbutPier#204378Is a correction applied when longitudinal and transverse pile spacing differ?262007-06-12
Sign in to ask