Column check
다주식 교각을 설계하고 있습니다. 그런데 기둥을 6개이상 설치할경우 기둥부의 부재력이 유리해 지지 않고 오히려 불리해지는 경우가 발생해서 문의 드립니다. 답변바랍니다
Answer
안녕하세요. 한길아이티입니다. 단면비교검토는 사용자께서 판단하시고 검토하시는 부분입니다. 경우에 따라 여러가지가 발생할 수 있으므로 충분한 검토를 하시고 판단하셔야 합니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #204376 | Placing the pier at the center of the shoe | 15 | 2007-06-12 |
| Answered | AAbutPier | #204375 | Cross beam settings for seismic analysis | 22 | 2007-06-12 |
| Answered | AAbutPier | #204377 | Please review wing wall check | 31 | 2007-06-12 |
| Answered | AAbutPier | #204374 | Section dimension error in section stress check | 42 | 2007-06-12 |
| Answered | AAbutPier | #204373 | Question about bearing coordinates | 53 | 2007-06-12 |
| Answered | AAbutPier | #204360 | Error when entering column section | 19 | 2007-06-12 |
| Answered | AAbutPier | #204359 | Merging bearing pedestal blocks | 26 | 2007-06-12 |
| Answered | AAbutPier | #204341 | Error entering support angle and slab dimensions | 52 | 2007-06-11 |
| Answered | AAbutPier | #204369 | Column check · Currently viewing | 23 | 2007-06-11 |
| Answered | AAbutPier | #204356 | Calculating pile properties | 49 | 2007-06-11 |
| Answered | AAbutPier | #204347 | Foundation spring constants for mass foundation in seismic analysis | 53 | 2007-06-11 |
| Answered | AAbutPier | #204345 | Question on coping main rebar and cycle | 21 | 2007-06-11 |
| Answered | AAbutPier | #204342 | Merging multiple BRX files | 29 | 2007-06-11 |
| Answered | AAbutPier | #204323 | Pile projection length in embankment | 45 | 2007-06-09 |
| Answered | AAbutPier | #204316 | Program error occurs | 34 | 2007-06-09 |
| Answered | AAbutPier | #204312 | Question about abutment reinforcement drawing | 49 | 2007-06-09 |
| Answered | AAbutPier | #204309 | Superstructure load | 38 | 2007-06-09 |
| Answered | AAbutPier | #204308 | Changing shoe positions on the bearing seat | 38 | 2007-06-08 |
| Answered | AAbutPier | #204334 | Pier step rebar | 54 | 2007-06-08 |
| Answered | AAbutPier | #204322 | Pile projection length in embankment | 49 | 2007-06-08 |