Pile projection length in embankment
성토부 구간 말뚝 돌출길이 3d이상 깊이에서 부터 토압을 작용하게 하고 싶은데...그 방법을 알고 싶어요
Answer
안녕하세요. 한길아이티입니다. 현재 프로그램에서 따로 토압을 작용할수 있는 방법은 없읍니다. 돌출말뚝일경우 도로교설계기준해설(하부구조편)238,284페이지에 산식을 이용하여 변위및 부재력을 산출하게 되는것입니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #204376 | Placing the pier at the center of the shoe | 15 | 2007-06-12 |
| Answered | AAbutPier | #204375 | Cross beam settings for seismic analysis | 22 | 2007-06-12 |
| Answered | AAbutPier | #204377 | Please review wing wall check | 31 | 2007-06-12 |
| Answered | AAbutPier | #204374 | Section dimension error in section stress check | 42 | 2007-06-12 |
| Answered | AAbutPier | #204373 | Question about bearing coordinates | 53 | 2007-06-12 |
| Answered | AAbutPier | #204360 | Error when entering column section | 19 | 2007-06-12 |
| Answered | AAbutPier | #204359 | Merging bearing pedestal blocks | 26 | 2007-06-12 |
| Answered | AAbutPier | #204341 | Error entering support angle and slab dimensions | 52 | 2007-06-11 |
| Answered | AAbutPier | #204369 | Column check | 23 | 2007-06-11 |
| Answered | AAbutPier | #204356 | Calculating pile properties | 49 | 2007-06-11 |
| Answered | AAbutPier | #204347 | Foundation spring constants for mass foundation in seismic analysis | 53 | 2007-06-11 |
| Answered | AAbutPier | #204345 | Question on coping main rebar and cycle | 21 | 2007-06-11 |
| Answered | AAbutPier | #204342 | Merging multiple BRX files | 29 | 2007-06-11 |
| Answered | AAbutPier | #204323 | Pile projection length in embankment · Currently viewing | 45 | 2007-06-09 |
| Answered | AAbutPier | #204316 | Program error occurs | 34 | 2007-06-09 |
| Answered | AAbutPier | #204312 | Question about abutment reinforcement drawing | 49 | 2007-06-09 |
| Answered | AAbutPier | #204309 | Superstructure load | 38 | 2007-06-09 |
| Answered | AAbutPier | #204308 | Changing shoe positions on the bearing seat | 38 | 2007-06-08 |
| Answered | AAbutPier | #204334 | Pier step rebar | 54 | 2007-06-08 |
| Answered | AAbutPier | #204322 | Pile projection length in embankment | 49 | 2007-06-08 |