About acting moment in pile check
<3주식교각> 말뚝 작용력 검토시, 기초설계 부분에서 기초중앙력 산정한 값과, 말뚝계산에 사용된 작용력값(모멘트부분)이 다르게 적용되고 있습니다. 설명에는, 말뚝검토시의 모멘트는 Mc = ∑V x e 를 적용한다, 여기서,e = B/2-(Mr-Mo)/∑V 라고 되어있습니다. 저항모멘트값을 구할때,Mr=∑Vxχ,B=32.000 m,χ=B/2+∑(Pi*di)/∑(Pi)을 사용하는데 <TABLE style="WIDTH: 420pt; BORDER-COLLAPSE: collapse" cell
Answer
안녕하세요. 한길아이티입니다. 검토하고 계신 계산서와 apier데이타을 올려주시기 바랍니다. 그리고 계산서에서 궁금하신 부분에 대해서 표시를 해서 올려주시면 감사하겠읍니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #203605 | Bearing seat reinforcement detailing error | 20 | 2007-05-08 |
| Answered | AAbutPier | #203598 | Superstructure beam layout does not work properly | 48 | 2007-05-08 |
| Answered | AAbutPier | #203596 | Pier elastic and plastic design give identical results | 37 | 2007-05-08 |
| Answered | AAbutPier | #203604 | About acting moment in pile check · Currently viewing | 34 | 2007-05-08 |
| Answered | AAbutPier | #203593 | Abutment shear rebar count error | 52 | 2007-05-08 |
| Answered | AAbutPier | #203585 | Missing rebar at pier bearing seat | 47 | 2007-05-08 |
| Answered | AAbutPier | #203583 | Bearing seat reinforcement detailing | 60 | 2007-05-08 |
| Answered | AAbutPier | #203565 | Question on shear reinforcement | 25 | 2007-05-07 |
| Answered | AAbutPier | #203563 | Dimension error in overall distribution rebar | 28 | 2007-05-07 |
| Answered | AAbutPier | #203589 | Temperature load calculation in pier report | 69 | 2007-05-07 |
| Answered | AAbutPier | #203557 | About pier shear reinforcement | 30 | 2007-05-07 |
| Answered | AAbutPier | #203554 | Data .apr file suddenly won't open - urgent | 13 | 2007-05-07 |
| Answered | AAbutPier | #203550 | Inquiry about wing wall haunch shape | 28 | 2007-05-07 |
| Answered | AAbutPier | #203584 | About bearing block rebar | 45 | 2007-05-07 |
| Answered | AAbutPier | #203582 | In the calculation report | 33 | 2007-05-07 |
| Answered | AAbutPier | #203578 | Follow-up question on shear reinforcement | 78 | 2007-05-07 |
| Answered | AAbutPier | #203575 | Minimum shear reinforcement | 41 | 2007-05-07 |
| Answered | AAbutPier | #203573 | Using EPS blocks as abutment backfill | 44 | 2007-05-07 |
| Answered | AAbutPier | #203561 | Reference height for under-girder clearance at the pier bearing seat | 23 | 2007-05-07 |
| Answered | AAbutPier | #203552 | About the T-shaped pier calculation report | 26 | 2007-05-07 |