Abutment shear rebar count error
첨부파일을 보면 A2교대의 경우 앞굽에만 전단철근(S1)이 20개이상 들어가는데 철근재료표상에는 23개로 나타납니다. 또 A1교대는 전단철근(S1)이 41개로 나오는데 40개가 맞는 것 같습니다. 검토 부탁드립니다.
Answer
안녕하세요. 한길아이티입니다. 전단철근개수에 대한 산출오류가 있었읍니다. 수정하여 오늘까지 업데이트 하도록 하겠읍니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #203605 | Bearing seat reinforcement detailing error | 20 | 2007-05-08 |
| Answered | AAbutPier | #203598 | Superstructure beam layout does not work properly | 48 | 2007-05-08 |
| Answered | AAbutPier | #203596 | Pier elastic and plastic design give identical results | 37 | 2007-05-08 |
| Answered | AAbutPier | #203604 | About acting moment in pile check | 34 | 2007-05-08 |
| Answered | AAbutPier | #203593 | Abutment shear rebar count error · Currently viewing | 52 | 2007-05-08 |
| Answered | AAbutPier | #203585 | Missing rebar at pier bearing seat | 47 | 2007-05-08 |
| Answered | AAbutPier | #203583 | Bearing seat reinforcement detailing | 60 | 2007-05-08 |
| Answered | AAbutPier | #203565 | Question on shear reinforcement | 25 | 2007-05-07 |
| Answered | AAbutPier | #203563 | Dimension error in overall distribution rebar | 28 | 2007-05-07 |
| Answered | AAbutPier | #203589 | Temperature load calculation in pier report | 69 | 2007-05-07 |
| Answered | AAbutPier | #203557 | About pier shear reinforcement | 30 | 2007-05-07 |
| Answered | AAbutPier | #203554 | Data .apr file suddenly won't open - urgent | 13 | 2007-05-07 |
| Answered | AAbutPier | #203550 | Inquiry about wing wall haunch shape | 28 | 2007-05-07 |
| Answered | AAbutPier | #203584 | About bearing block rebar | 45 | 2007-05-07 |
| Answered | AAbutPier | #203582 | In the calculation report | 33 | 2007-05-07 |
| Answered | AAbutPier | #203578 | Follow-up question on shear reinforcement | 78 | 2007-05-07 |
| Answered | AAbutPier | #203575 | Minimum shear reinforcement | 41 | 2007-05-07 |
| Answered | AAbutPier | #203573 | Using EPS blocks as abutment backfill | 44 | 2007-05-07 |
| Answered | AAbutPier | #203561 | Reference height for under-girder clearance at the pier bearing seat | 23 | 2007-05-07 |
| Answered | AAbutPier | #203552 | About the T-shaped pier calculation report | 26 | 2007-05-07 |