Missing rebar at pier bearing seat
안녕하세요 코핑상단부 교축방향과 교직방향으로 양방향 단차가 있읍니다 받침 상세가 3개소 입니다 1개소에 대한 받침철근 상세 및 철근이 누락되며 돌출부 철근이 겹쳐져 나옵니다
Answer
안녕하세요. 한길아이티입니다. 보내주신화일의 검토결과는 다음과 같읍니다. 교량받침의 철근상세는 철근길이에 대해서 변하는길이로 적용을 한것이므로 철근량에는 크게 지장이없을것으로 판단됩니다. 그리고 교각두부보형상이 교축,교직방향 단차가 있는경우는 현재 프로그램에서 구현하기 어려운 부분이며 배근도가 지원하기 어렵습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #203605 | Bearing seat reinforcement detailing error | 20 | 2007-05-08 |
| Answered | AAbutPier | #203598 | Superstructure beam layout does not work properly | 48 | 2007-05-08 |
| Answered | AAbutPier | #203596 | Pier elastic and plastic design give identical results | 37 | 2007-05-08 |
| Answered | AAbutPier | #203604 | About acting moment in pile check | 34 | 2007-05-08 |
| Answered | AAbutPier | #203593 | Abutment shear rebar count error | 52 | 2007-05-08 |
| Answered | AAbutPier | #203585 | Missing rebar at pier bearing seat · Currently viewing | 47 | 2007-05-08 |
| Answered | AAbutPier | #203583 | Bearing seat reinforcement detailing | 60 | 2007-05-08 |
| Answered | AAbutPier | #203565 | Question on shear reinforcement | 25 | 2007-05-07 |
| Answered | AAbutPier | #203563 | Dimension error in overall distribution rebar | 28 | 2007-05-07 |
| Answered | AAbutPier | #203589 | Temperature load calculation in pier report | 69 | 2007-05-07 |
| Answered | AAbutPier | #203557 | About pier shear reinforcement | 30 | 2007-05-07 |
| Answered | AAbutPier | #203554 | Data .apr file suddenly won't open - urgent | 13 | 2007-05-07 |
| Answered | AAbutPier | #203550 | Inquiry about wing wall haunch shape | 28 | 2007-05-07 |
| Answered | AAbutPier | #203584 | About bearing block rebar | 45 | 2007-05-07 |
| Answered | AAbutPier | #203582 | In the calculation report | 33 | 2007-05-07 |
| Answered | AAbutPier | #203578 | Follow-up question on shear reinforcement | 78 | 2007-05-07 |
| Answered | AAbutPier | #203575 | Minimum shear reinforcement | 41 | 2007-05-07 |
| Answered | AAbutPier | #203573 | Using EPS blocks as abutment backfill | 44 | 2007-05-07 |
| Answered | AAbutPier | #203561 | Reference height for under-girder clearance at the pier bearing seat | 23 | 2007-05-07 |
| Answered | AAbutPier | #203552 | About the T-shaped pier calculation report | 26 | 2007-05-07 |