Follow-up question on shear reinforcement
16개로 입력을 하라고 하셨는데 17개로 할 경우 전단철근수가 136개로 다음첨부 파일과 같이 배근이 될것 같은데요 17개로 했을경우 배근도 상의 다리수 16개가 됩니다. 확인부탁드립니다
Answer
안녕하세요. 한길아이티입니다. 전단철근에 다리개수적용을 짝수개수로 적용되게끔 수정하여 오늘까지 업데이트 하겠읍니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #203605 | Bearing seat reinforcement detailing error | 20 | 2007-05-08 |
| Answered | AAbutPier | #203598 | Superstructure beam layout does not work properly | 48 | 2007-05-08 |
| Answered | AAbutPier | #203596 | Pier elastic and plastic design give identical results | 37 | 2007-05-08 |
| Answered | AAbutPier | #203604 | About acting moment in pile check | 34 | 2007-05-08 |
| Answered | AAbutPier | #203593 | Abutment shear rebar count error | 52 | 2007-05-08 |
| Answered | AAbutPier | #203585 | Missing rebar at pier bearing seat | 47 | 2007-05-08 |
| Answered | AAbutPier | #203583 | Bearing seat reinforcement detailing | 60 | 2007-05-08 |
| Answered | AAbutPier | #203565 | Question on shear reinforcement | 25 | 2007-05-07 |
| Answered | AAbutPier | #203563 | Dimension error in overall distribution rebar | 28 | 2007-05-07 |
| Answered | AAbutPier | #203589 | Temperature load calculation in pier report | 69 | 2007-05-07 |
| Answered | AAbutPier | #203557 | About pier shear reinforcement | 30 | 2007-05-07 |
| Answered | AAbutPier | #203554 | Data .apr file suddenly won't open - urgent | 13 | 2007-05-07 |
| Answered | AAbutPier | #203550 | Inquiry about wing wall haunch shape | 28 | 2007-05-07 |
| Answered | AAbutPier | #203584 | About bearing block rebar | 45 | 2007-05-07 |
| Answered | AAbutPier | #203582 | In the calculation report | 33 | 2007-05-07 |
| Answered | AAbutPier | #203578 | Follow-up question on shear reinforcement · Currently viewing | 78 | 2007-05-07 |
| Answered | AAbutPier | #203575 | Minimum shear reinforcement | 41 | 2007-05-07 |
| Answered | AAbutPier | #203573 | Using EPS blocks as abutment backfill | 44 | 2007-05-07 |
| Answered | AAbutPier | #203561 | Reference height for under-girder clearance at the pier bearing seat | 23 | 2007-05-07 |
| Answered | AAbutPier | #203552 | About the T-shaped pier calculation report | 26 | 2007-05-07 |