Using EPS blocks as abutment backfill
기존 교대의 높이를 증가시키는 교대 보수설계 과정에서 토압의 증가에 따른 벽체 및 기초의 휨모멘트 증가로 교대 뒤채움재로 EPS 토목블럭을 사용하려 합니다. 단가 문제로 일부 높이까지는 토사로 하고 일부는 EPS 블럭을 적용하려 하는 데 AAbutPier에서 어떻게 적용을 해야 할지 난감합니다. 방법 좀 알려주시기 바랍니다. 좋은하루 되십시오! [개인정보] [개인정보] ([개인정보])
Answer
안녕하세요. 한길아이티입니다. 현재 버전에서는 지원되지 않습니다. 이 기능은 AAbutPier2007에서 지원됩니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #203605 | Bearing seat reinforcement detailing error | 20 | 2007-05-08 |
| Answered | AAbutPier | #203598 | Superstructure beam layout does not work properly | 48 | 2007-05-08 |
| Answered | AAbutPier | #203596 | Pier elastic and plastic design give identical results | 37 | 2007-05-08 |
| Answered | AAbutPier | #203604 | About acting moment in pile check | 34 | 2007-05-08 |
| Answered | AAbutPier | #203593 | Abutment shear rebar count error | 52 | 2007-05-08 |
| Answered | AAbutPier | #203585 | Missing rebar at pier bearing seat | 47 | 2007-05-08 |
| Answered | AAbutPier | #203583 | Bearing seat reinforcement detailing | 60 | 2007-05-08 |
| Answered | AAbutPier | #203565 | Question on shear reinforcement | 25 | 2007-05-07 |
| Answered | AAbutPier | #203563 | Dimension error in overall distribution rebar | 28 | 2007-05-07 |
| Answered | AAbutPier | #203589 | Temperature load calculation in pier report | 69 | 2007-05-07 |
| Answered | AAbutPier | #203557 | About pier shear reinforcement | 30 | 2007-05-07 |
| Answered | AAbutPier | #203554 | Data .apr file suddenly won't open - urgent | 13 | 2007-05-07 |
| Answered | AAbutPier | #203550 | Inquiry about wing wall haunch shape | 28 | 2007-05-07 |
| Answered | AAbutPier | #203584 | About bearing block rebar | 45 | 2007-05-07 |
| Answered | AAbutPier | #203582 | In the calculation report | 33 | 2007-05-07 |
| Answered | AAbutPier | #203578 | Follow-up question on shear reinforcement | 78 | 2007-05-07 |
| Answered | AAbutPier | #203575 | Minimum shear reinforcement | 41 | 2007-05-07 |
| Answered | AAbutPier | #203573 | Using EPS blocks as abutment backfill · Currently viewing | 44 | 2007-05-07 |
| Answered | AAbutPier | #203561 | Reference height for under-girder clearance at the pier bearing seat | 23 | 2007-05-07 |
| Answered | AAbutPier | #203552 | About the T-shaped pier calculation report | 26 | 2007-05-07 |