AnsweredAAbutPierQ&A #2033202007-04-24 01:16 · Views 43

Beam layout problem on a curved bridge

곡선교량에서 빔배치을 하는데 2@35+3@35 에서 앞구간은 연속부 빔간 거리가 100MM 근처로 배치되나 뒷구간 연속부 빔간 거리는 50+150 =200 정도로 넓어짐. 만약 빔정보에서 s1을 50으로 두지 않으면 신축이음부에서 문제가 발생할것으로 보임. 해결방접을 알려주시가 바랍니다. 그리고 빔배치에서 줌 윈도우 후에 줌 다이나믹 하면 화면이 안보이는 문제도 좀 알려주십시오. 그럼 수고하십시오.

Answer

안녕하세요. 한길아이티입니다. APIER2003에서는 거더배치시 거더간 최소거리 50이 유지되게끔 되어 있읍니다. APIER2007에서는 거더축선간 최소거리 50에 대한 옵션이 추가될 예정에 있읍니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#203394Question on calculating horizontal loads on bridge bearings232007-04-26
AnsweredAAbutPier#203386On the bearing seat surface322007-04-26
AnsweredAAbutPier#203378Approach slab wing wall angle232007-04-25
AnsweredAAbutPier#203388Calculating centrifugal load in the pier calculation report342007-04-25
AnsweredAAbutPier#203375Inquiry about materials202007-04-25
AnsweredAAbutPier#203364About the wing wall reinforcement drawing602007-04-25
AnsweredAAbutPier#203363Abutment 1 reinforcement detailing issue472007-04-25
AnsweredAAbutPier#203353Foundation shear rebar452007-04-25
AnsweredAAbutPier#203351Question on calculating horizontal loads on bridge bearings612007-04-25
AnsweredAAbutPier#203342Foundation reinforcement detailing652007-04-24
AnsweredAAbutPier#203341Please review442007-04-24
AnsweredAAbutPier#203336Wall reinforcement detailing looks wrong372007-04-24
AnsweredAAbutPier#203360Error in abutment wing wall reinforcement drawing402007-04-24
AnsweredAAbutPier#203352When entering abutment dimensions322007-04-24
AnsweredAAbutPier#203339Hooked rebar542007-04-24
AnsweredAAbutPier#203335When checking cast-in-place piles542007-04-24
AnsweredAAbutPier#203328Internal application error362007-04-24
AnsweredAAbutPier#203323Incorrect horizontal force under seismic load502007-04-24
AnsweredAAbutPier#203320Beam layout problem on a curved bridge · Currently viewing432007-04-24
AnsweredAAbutPier#203319Skewed bridge on a curved alignment (2)292007-04-23
Sign in to ask