Pier cap reinforcement detailing

1.다주식 교각의 두부보 배근을 하는데 배근이 좀 이상하게 됩니다. 권고안을 눌러도 변화가 없네요 확인부탁드립니다. (교각 1) 2. sap 자동계산시 기초검토시 멈추네요. 확인부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 교각설계환경-설계조건-철근항복강도가 4000MPa를 입력되어 있읍니다. 단위계에 맞도록 400으로 수정하시면 두개의 문제점들이 해결됩니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#203258Railway bridge abutment242007-04-19
AnsweredAAbutPier#203255Section forces of the pier foundation192007-04-19
AnsweredAAbutPier#203251Changing rebar diameter with strength change192007-04-19
AnsweredAAbutPier#203248Reinforcement detailing question292007-04-19
AnsweredAAbutPier#203240Questions on cross-tie layout and approach slab552007-04-18
AnsweredAAbutPier#203233Error during seismic analysis262007-04-18
AnsweredAAbutPier#203242Concrete specification in quantity report output162007-04-18
AnsweredAAbutPier#203237Question632007-04-18
AnsweredAAbutPier#203229Railway bridge abutment and pier502007-04-18
AnsweredAAbutPier#203226Question about applying abutment reactions462007-04-18
AnsweredAAbutPier#203224Railway bridge abutment and pier462007-04-18
AnsweredAAbutPier#203220Railway bridge abutment and pier342007-04-18
AnsweredAAbutPier#203218Design check error in pier foundation settings472007-04-17
AnsweredAAbutPier#203216Question about entering the horizontal subgrade reaction coefficient542007-04-17
AnsweredAAbutPier#203212Pier cap reinforcement detailing · Currently viewing312007-04-17
AnsweredAAbutPier#203210Adjusting dimension line text size422007-04-17
AnsweredAAbutPier#203204Foundation rebar shape for skewed bridges292007-04-17
AnsweredAAbutPier#203201Question about column main rebar and tie placement312007-04-16
AnsweredAAbutPier#203192Seismic modeling error372007-04-16
AnsweredAAbutPier#203189Seismic modeling222007-04-14
Sign in to ask