Pier foundation main rebar details
설계환경에서 교각 기초 하면주철근 형태를 "-"자로 적용하였는데, 상면철근이 기초측면 전체 길이로 적용되지 않습니다. 철근제원에서 권고안을 눌러도요...봐주십시요~
Answer
안녕하세요. 한길아이티입니다. 교각 기초 하면주철근 형태를 "-"자로 선택시 권고안시 교각상부철근산정에 오류가 있었읍니다. 수정하여 오늘까지 업데이트 하겠읍니다. 우선 B1,B3의 B구간을 1125->2250으로 입력하시면 됩니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #202866 | Error when checking the foundation of pier 3 | 43 | 2007-03-23 |
| Answered | AAbutPier | #202864 | Seismic analysis modeling problem | 20 | 2007-03-23 |
| Answered | AAbutPier | #202860 | Please check the horizontal force values under earthquake | 24 | 2007-03-23 |
| Answered | AAbutPier | #202842 | Pier foundation main rebar details · Currently viewing | 42 | 2007-03-22 |
| Answered | AAbutPier | #202840 | Request to check horizontal force under earthquake for abutment A1 | 46 | 2007-03-22 |
| Answered | AAbutPier | #202834 | Follow-up: comparison file | 78 | 2007-03-22 |
| Answered | AAbutPier | #202833 | Something seems wrong | 73 | 2007-03-22 |
| Answered | AAbutPier | #202829 | Not sure what is causing this | 57 | 2007-03-22 |
| Answered | AAbutPier | #202857 | Torch-type wall | 37 | 2007-03-22 |
| Answered | AAbutPier | #202853 | Orthogonal layout on a curved alignment (2) | 37 | 2007-03-22 |
| Answered | AAbutPier | #202847 | Entering stringers for steel box | 41 | 2007-03-22 |
| Answered | AAbutPier | #202836 | Seismic analysis does not run | 70 | 2007-03-22 |
| Answered | AAbutPier | #202835 | Orthogonal layout on a curved alignment | 59 | 2007-03-22 |
| Answered | AAbutPier | #202823 | Wing wall reinforcement drawing section extends beyond the foundation | 58 | 2007-03-22 |
| Answered | AAbutPier | #202828 | BRX file gives an error | 39 | 2007-03-21 |
| Answered | AAbutPier | #202811 | Support treatment for continuous spans | 70 | 2007-03-21 |
| Answered | AAbutPier | #202824 | Calculation report file is too large | 77 | 2007-03-21 |
| Answered | AAbutPier | #202808 | Bridge bearing error | 42 | 2007-03-21 |
| Answered | AAbutPier | #202800 | Pile cap reinforcement needs up to 4 layers | 40 | 2007-03-21 |
| Answered | AAbutPier | #202801 | Horizontal shear reinforcement detailing in pier coping | 39 | 2007-03-20 |