Request to check horizontal force under earthquake for abutment A1
A1교대 지진시 수평력이 너무크게 나오네요 교량받침용량을 2배이상 키워도 N.G가 나옵니다. 변경설계라 기존 지진시 수평력과 비슷할거라 예상되는데 지진시 수평력에 대한 교량받침용량이 너무차이가 납니다. 검토부타드립니다.
Answer
안녕하세요. 한길아이티입니다. A1의 교량받침에 수평력이 집중되므로 교각 교량받침의 교량받침의 스프링강성을 높이면 될것 같읍니다. P1의 스프링을 최고로 하니 A1의 교량받침이 OK가 되네요 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #202866 | Error when checking the foundation of pier 3 | 43 | 2007-03-23 |
| Answered | AAbutPier | #202864 | Seismic analysis modeling problem | 20 | 2007-03-23 |
| Answered | AAbutPier | #202860 | Please check the horizontal force values under earthquake | 24 | 2007-03-23 |
| Answered | AAbutPier | #202842 | Pier foundation main rebar details | 42 | 2007-03-22 |
| Answered | AAbutPier | #202840 | Request to check horizontal force under earthquake for abutment A1 · Currently viewing | 46 | 2007-03-22 |
| Answered | AAbutPier | #202834 | Follow-up: comparison file | 78 | 2007-03-22 |
| Answered | AAbutPier | #202833 | Something seems wrong | 73 | 2007-03-22 |
| Answered | AAbutPier | #202829 | Not sure what is causing this | 57 | 2007-03-22 |
| Answered | AAbutPier | #202857 | Torch-type wall | 37 | 2007-03-22 |
| Answered | AAbutPier | #202853 | Orthogonal layout on a curved alignment (2) | 37 | 2007-03-22 |
| Answered | AAbutPier | #202847 | Entering stringers for steel box | 41 | 2007-03-22 |
| Answered | AAbutPier | #202836 | Seismic analysis does not run | 70 | 2007-03-22 |
| Answered | AAbutPier | #202835 | Orthogonal layout on a curved alignment | 59 | 2007-03-22 |
| Answered | AAbutPier | #202823 | Wing wall reinforcement drawing section extends beyond the foundation | 58 | 2007-03-22 |
| Answered | AAbutPier | #202828 | BRX file gives an error | 39 | 2007-03-21 |
| Answered | AAbutPier | #202811 | Support treatment for continuous spans | 70 | 2007-03-21 |
| Answered | AAbutPier | #202824 | Calculation report file is too large | 77 | 2007-03-21 |
| Answered | AAbutPier | #202808 | Bridge bearing error | 42 | 2007-03-21 |
| Answered | AAbutPier | #202800 | Pile cap reinforcement needs up to 4 layers | 40 | 2007-03-21 |
| Answered | AAbutPier | #202801 | Horizontal shear reinforcement detailing in pier coping | 39 | 2007-03-20 |