Seismic analysis does not run
내진해석이 안되는데 그 이유를 모르겠습니다... 검토 부탁 드립니다...
Answer
안녕하세요. 한길아이티입니다. 지점각도입력에서 유간이 입력되어야 내진모델링이 됩니다. 프로그램의 구성상 시점은 항상 유간이 존재해야됩니다. 따라서 교량의 시점이 이동이 되겠죠 유간만큼 교량의 시점을 이동시킨 값으로 설정하시면 됩니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #202866 | Error when checking the foundation of pier 3 | 43 | 2007-03-23 |
| Answered | AAbutPier | #202864 | Seismic analysis modeling problem | 20 | 2007-03-23 |
| Answered | AAbutPier | #202860 | Please check the horizontal force values under earthquake | 24 | 2007-03-23 |
| Answered | AAbutPier | #202842 | Pier foundation main rebar details | 42 | 2007-03-22 |
| Answered | AAbutPier | #202840 | Request to check horizontal force under earthquake for abutment A1 | 46 | 2007-03-22 |
| Answered | AAbutPier | #202834 | Follow-up: comparison file | 78 | 2007-03-22 |
| Answered | AAbutPier | #202833 | Something seems wrong | 73 | 2007-03-22 |
| Answered | AAbutPier | #202829 | Not sure what is causing this | 57 | 2007-03-22 |
| Answered | AAbutPier | #202857 | Torch-type wall | 37 | 2007-03-22 |
| Answered | AAbutPier | #202853 | Orthogonal layout on a curved alignment (2) | 37 | 2007-03-22 |
| Answered | AAbutPier | #202847 | Entering stringers for steel box | 41 | 2007-03-22 |
| Answered | AAbutPier | #202836 | Seismic analysis does not run · Currently viewing | 70 | 2007-03-22 |
| Answered | AAbutPier | #202835 | Orthogonal layout on a curved alignment | 59 | 2007-03-22 |
| Answered | AAbutPier | #202823 | Wing wall reinforcement drawing section extends beyond the foundation | 58 | 2007-03-22 |
| Answered | AAbutPier | #202828 | BRX file gives an error | 39 | 2007-03-21 |
| Answered | AAbutPier | #202811 | Support treatment for continuous spans | 70 | 2007-03-21 |
| Answered | AAbutPier | #202824 | Calculation report file is too large | 77 | 2007-03-21 |
| Answered | AAbutPier | #202808 | Bridge bearing error | 42 | 2007-03-21 |
| Answered | AAbutPier | #202800 | Pile cap reinforcement needs up to 4 layers | 40 | 2007-03-21 |
| Answered | AAbutPier | #202801 | Horizontal shear reinforcement detailing in pier coping | 39 | 2007-03-20 |