Skip to content
AnsweredAAbutPierQ&A #2019942007-01-27 00:19 · Views 67

About double-layer rebar in abutment

교대 배근도 상에서 2단철근과 2단철근 길이 변경에 대해서 답변 좀 부탁 드립니다.. 그리고, 두부보강은 업체에 별도 문의 해야 하는 겁니까?..

Answer

안녕하세요. 한길아이티입니다. 교대주철근입력-기초뒷굽과 벽체 2단철근의 거리가 누락되어있읍니다. 피복을 입력하셔야 합니다. 그리고 교대벽체부배근입력의 2단수직철근높이와 수평철근배치에 대한 옵션이 있읍니다. 두부보강은 프로그램에서 계산서출력시 설계기준에 나온 식을 사용하는것이며 두부보강업체에서 제공한 두부보강을 사용한경우에는 해당업체에 의뢰하시기 바랍니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#202039Wing wall double-layer reinforcement342007-01-30
AnsweredAAbutPier#202033Please check EL. with superelevation in the median section322007-01-30
AnsweredAAbutPier#202042Question about quantities312007-01-30
AnsweredAAbutPier#202032Backfill quantity612007-01-30
AnsweredAAbutPier#202013Errors in bridge bearing bottom reinforcement and bearing concrete reinforcement572007-01-29
AnsweredAAbutPier#202011Uploading data592007-01-29
AnsweredAAbutPier#202009Error when applying an angle to a front-wall type wing wall612007-01-29
AnsweredAAbutPier#2020073D rendering and structural analysis not working592007-01-29
AnsweredAAbutPier#202027Section dimension input for multi-column pier352007-01-29
AnsweredAAbutPier#202025Unit typo in bridge bearing bottom reinforcement check272007-01-29
AnsweredAAbutPier#202023Rebar notation style482007-01-29
AnsweredAAbutPier#202006Reference section distance from road centerline and wing wall movement802007-01-28
AnsweredAAbutPier#201994About double-layer rebar in abutment · Currently viewing672007-01-27
AnsweredAAbutPier#201984Question about pile reactions452007-01-26
AnsweredAAbutPier#201982ARoad data is read differently in APier692007-01-26
AnsweredAAbutPier#201991Column shear in calculation report542007-01-26
AnsweredAAbutPier#201959SAP file won't run392007-01-25
AnsweredAAbutPier#201972About structural calculation report output452007-01-25
AnsweredAAbutPier#201970Regarding answer [25185]562007-01-25
AnsweredAAbutPier#201964About structural calculation report output482007-01-25
Sign in to ask