Drawing output error
올려드린 파일 도면출력 배근도 a2 시흥방향과 인천방향 도면 각 3번들이 출력이 되지 않네요 문제해결 부탁드립니다
Answer
안녕하세요. 한길아이티입니다. 교대주철근입력-날개벽의 D구간의 주철근입력이 누락되어 있읍니다. 입력하시고 철근제원에서 권고안을 누르시고 도면을 생성하시면 문제가 해결됩니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #201955 | Wing wall, approach slab | 57 | 2007-01-25 |
| Answered | AAbutPier | #201954 | Response modification factor | 61 | 2007-01-25 |
| Answered | AAbutPier | #201957 | [Personal info] Please unlock | 33 | 2007-01-25 |
| Answered | AAbutPier | #201951 | Missing vertical shear rebar | 46 | 2007-01-25 |
| Answered | AAbutPier | #201945 | Request for the software files used in training | 38 | 2007-01-25 |
| Answered | AAbutPier | #201940 | Checking shear force values in foundation section force check | 73 | 2007-01-25 |
| Answered | AAbutPier | #201935 | Drawing output error · Currently viewing | 56 | 2007-01-24 |
| Answered | AAbutPier | #201933 | About section input for seismic analysis | 47 | 2007-01-24 |
| Answered | AAbutPier | #201932 | Pier column design | 59 | 2007-01-24 |
| Answered | AAbutPier | #201941 | Wing wall rebar quantity missing | 40 | 2007-01-24 |
| Answered | AAbutPier | #201922 | Problem with the seismic analysis model, please check | 59 | 2007-01-23 |
| Answered | AAbutPier | #201919 | Drawing error in abutment wall reinforcement detailing | 61 | 2007-01-23 |
| Answered | AAbutPier | #201925 | Regarding the answer to [25137] | 55 | 2007-01-23 |
| Answered | AAbutPier | #201921 | Please review my data | 52 | 2007-01-23 |
| Answered | AAbutPier | #201906 | Re-uploading 1 | 33 | 2007-01-22 |
| Answered | AAbutPier | #201895 | Regarding post no. 25107 | 64 | 2007-01-22 |
| Answered | AAbutPier | #201893 | Please check an error in abutment pile check | 52 | 2007-01-20 |
| Answered | AAbutPier | #201885 | Two-layer reinforcement in wing wall | 78 | 2007-01-20 |
| Answered | AAbutPier | #201884 | Foundation shear rebar | 70 | 2007-01-20 |
| Answered | AAbutPier | #201882 | Pile cap beam reinforcement detailing | 79 | 2007-01-20 |