Pier bearing seat reinforcement detailing
안녕하세요 교각 교좌면의 철근배근상태가 저장이 안되고 자꾸 원상복귀(N.G상태)됩니다. 검토부탁드립니다.
Answer
안녕하세요. 한길아이티입니다. 교각교좌면제원입력에서 전열과 후열의 슈의 콘크리트 블록을 통합해서 사용하는 경우에는 슈7~12의 DL1,DL2,B,C의 수치를 0으로 입력하셔야 합니다. 전열의 수치(DL2)가 1550으로 입력이 되어 있으므로 콘크리트 블록은 통합이 될것입니다. 그리고 나서 교좌면 배근에 가서 배치를 보시고 확인하시면 됩니다. 참고로 작업한 화일을 올려드립니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #201778 | Foundation shrinkage and temperature rebar check | 40 | 2007-01-11 |
| Answered | AAbutPier | #201772 | About integral abutments | 41 | 2007-01-11 |
| Answered | AAbutPier | #201768 | Inquiry about temperature load | 36 | 2007-01-11 |
| Answered | AAbutPier | #201759 | Main rebar layout for track-shaped pier column section | 26 | 2007-01-10 |
| Answered | AAbutPier | #201755 | Missing wing wall rebar | 31 | 2007-01-10 |
| Answered | AAbutPier | #201746 | Pier superstructure reactions | 30 | 2007-01-10 |
| Answered | AAbutPier | #201763 | Question about data input window when setting cross beams in seismic analysis | 30 | 2007-01-10 |
| Answered | AAbutPier | #201744 | Question | 51 | 2007-01-10 |
| Answered | AAbutPier | #201737 | Wing wall reinforcement drawing is generated incorrectly | 42 | 2007-01-10 |
| Answered | AAbutPier | #201736 | Internal error | 40 | 2007-01-10 |
| Answered | AAbutPier | #201733 | Inquiry about abutment rebar | 69 | 2007-01-09 |
| Answered | AAbutPier | #201727 | Data from Beamdeck is not coming through correctly, please check | 68 | 2007-01-09 |
| Answered | AAbutPier | #201721 | Question about pier coping reinforcement detailing | 45 | 2007-01-09 |
| Answered | AAbutPier | #201717 | Rebar placement in wing wall reinforcement drawing looks wrong | 112 | 2007-01-09 |
| Answered | AAbutPier | #201716 | Error in cross beam input | 63 | 2007-01-08 |
| Answered | AAbutPier | #201714 | Please check pile length in abutment general drawing | 65 | 2007-01-08 |
| Answered | AAbutPier | #201695 | Pier bearing seat reinforcement detailing · Currently viewing | 48 | 2007-01-05 |
| Answered | AAbutPier | #201691 | Question about rebar reinforcement detailing | 53 | 2007-01-05 |
| Answered | AAbutPier | #201688 | About the pile calculation report | 42 | 2007-01-05 |
| Answered | AAbutPier | #201689 | Embankment slope direction is reversed in wing wall dimensions | 39 | 2007-01-05 |