Parapet height reference in abutment general drawing
안녕하세요..수고많으십니다.. 교대입력부분에서 흉벽높이가 상이하여 이렇게 글을 올립니다.. 다름이 아니라 일반입력/슬래브제원입력에서 슬래브중앙부 station및 EL은 받침(SHOE)중심기준이고 교대입력/정면도입력에서 교대중심 PARAPET상단 station및 EL은 교량시점기준으로 되어있습니다. 교대입력/단면도입력에서 흉벽높이(PH)가 받침(SHOE)중심기준EL를 기준으로 산정되어 교대높이가 종단구배차만큼의 오차가 발생합니다..흉벽높이(PH)를 교대PARAPET상단 EL을 적용하는게 맞을것같습니다..검토부탁드립니다..
Answer2006-12-28 16:03
안녕하세요. 한길아이티입니다. 검토하고계신 APIER화일을 올려주시기 바랍니다. 그리고 오차의 수치까지 적어주시면 검토하는데 도움이 될것 같읍니다. 감사합니다.
Follow-up2006-12-29 14:15
파일올립니다..오차는 1입니다..철도교라 종단구배가 완만해서.. <><>>
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #201675 | Wall rebar looks wrong | 55 | 2007-01-05 |
| Answered | AAbutPier | #201671 | Abutment reinforcement drawing | 30 | 2007-01-05 |
| Answered | AAbutPier | #201665 | Please review | 22 | 2007-01-04 |
| Answered | AAbutPier | #201664 | Can the bracket rebar diameter be changed when creating an abutment bracket? | 26 | 2007-01-04 |
| Answered | AAbutPier | #201670 | Pier foundation shear check | 26 | 2007-01-04 |
| Answered | AAbutPier | #201646 | Applying the response modification factor | 20 | 2007-01-03 |
| Answered | AAbutPier | #201656 | Question about slope | 37 | 2007-01-03 |
| Answered | AAbutPier | #201637 | Question about wing wall distribution rebar | 53 | 2007-01-03 |
| Answered | AAbutPier | #201648 | Ground information and tie bars | 32 | 2007-01-03 |
| Answered | AAbutPier | #201640 | Live load in pier calculation | 32 | 2007-01-03 |
| Answered | AAbutPier | #201622 | Scaffolding ladder | 56 | 2007-01-03 |
| Answered | AAbutPier | #201621 | Rebar not placed in wing wall reinforcement drawing | 36 | 2007-01-03 |
| Answered | AAbutPier | #201620 | Follow-up to my phone inquiry | 33 | 2007-01-03 |
| Answered | AAbutPier | #201614 | Parapet height reference in abutment general drawing (reposted) | 108 | 2007-01-02 |
| Answered | AAbutPier | #201609 | Bearing horizontal force is too high | 34 | 2007-01-02 |
| Answered | AAbutPier | #201628 | Internal program error | 18 | 2007-01-02 |
| Answered | AAbutPier | #201604 | Question about the rebar material schedule | 40 | 2006-12-29 |
| Answered | AAbutPier | #201599 | Abutment wall reinforcement drawing | 49 | 2006-12-29 |
| Answered | AAbutPier | #201594 | Parapet height reference in abutment general drawing · Currently viewing | 73 | 2006-12-28 |
| Answered | AAbutPier | #201589 | Please check distribution rebar at bearing seat step | 31 | 2006-12-28 |