Skip to content
AnsweredAAbutPierQ&A #2015792006-12-27 13:23 · Views 37

ABEAM DECK compatibility?

먼저 연말에 수고가 많습니다. 1. 빔데크를 피어에서 불러왔을때 지간구성입력항이 좀 상이한것 같습니다. 상부와 하부프로그램의 지간구성을 검토부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 수정하여 업데이트 하겠읍니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#201573Uploading file following my phone call472006-12-27
AnsweredAAbutPier#201568Seismic analysis of rigid-frame bridge abutment732006-12-27
AnsweredAAbutPier#201579ABEAM DECK compatibility? · Currently viewing372006-12-27
AnsweredAAbutPier#201576Thanks for the answer, one more question702006-12-27
AnsweredAAbutPier#201567Seismic analysis modeling?632006-12-27
AnsweredAAbutPier#201564Earthwork quantity looks wrong552006-12-27
AnsweredAAbutPier#201562Pier reinforcement drawing issue522006-12-27
AnsweredAAbutPier#201560Runtime error442006-12-26
AnsweredAAbutPier#201558Modeling analysis does not run372006-12-26
AnsweredAAbutPier#201555Internal program error during seismic calculation622006-12-26
AnsweredAAbutPier#201551Pile reaction looks wrong632006-12-23
AnsweredAAbutPier#201548Wing wall length depending on thickness292006-12-23
AnsweredAAbutPier#201543Please check the quantity report452006-12-22
AnsweredAAbutPier#201540Internal application error432006-12-22
AnsweredAAbutPier#201538Borehole log and abutment calculation report results?612006-12-22
AnsweredAAbutPier#201535Elastic seismic force issue522006-12-22
AnsweredAAbutPier#201532Please check wing wall main rebar322006-12-22
AnsweredAAbutPier#201526Error during seismic analysis522006-12-22
AnsweredAAbutPier#201520File for question [24702] (no content)682006-12-20
AnsweredAAbutPier#201518Abutment report: backfill earth pressure (normal, vertical) in foundation design loads, etc.692006-12-20
Sign in to ask