Skip to content
AnsweredAAbutPierQ&A #2015642006-12-27 02:16 · Views 55

Earthwork quantity looks wrong

오늘 업데이트를 했는데 토공수량 산출시 다운초 방향에 대한 토공수량만 산출되고 구영방향에 대한 토공수량은 집계만 생성되네여..ㅠㅠ

Answer

안녕하세요. 한길아이티입니다. 이부분은 업데이트와상관이 없으며 설계교대입력에서 교대명이 구영방향,다운초방향이 동일하기때문에 생기는 현상입니다. 교대명에 방향명을 추가하시면 수량산출이 원할히 됩니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#201573Uploading file following my phone call472006-12-27
AnsweredAAbutPier#201568Seismic analysis of rigid-frame bridge abutment732006-12-27
AnsweredAAbutPier#201579ABEAM DECK compatibility?372006-12-27
AnsweredAAbutPier#201576Thanks for the answer, one more question702006-12-27
AnsweredAAbutPier#201567Seismic analysis modeling?632006-12-27
AnsweredAAbutPier#201564Earthwork quantity looks wrong · Currently viewing552006-12-27
AnsweredAAbutPier#201562Pier reinforcement drawing issue522006-12-27
AnsweredAAbutPier#201560Runtime error442006-12-26
AnsweredAAbutPier#201558Modeling analysis does not run372006-12-26
AnsweredAAbutPier#201555Internal program error during seismic calculation622006-12-26
AnsweredAAbutPier#201551Pile reaction looks wrong632006-12-23
AnsweredAAbutPier#201548Wing wall length depending on thickness292006-12-23
AnsweredAAbutPier#201543Please check the quantity report452006-12-22
AnsweredAAbutPier#201540Internal application error432006-12-22
AnsweredAAbutPier#201538Borehole log and abutment calculation report results?612006-12-22
AnsweredAAbutPier#201535Elastic seismic force issue522006-12-22
AnsweredAAbutPier#201532Please check wing wall main rebar322006-12-22
AnsweredAAbutPier#201526Error during seismic analysis522006-12-22
AnsweredAAbutPier#201520File for question [24702] (no content)682006-12-20
AnsweredAAbutPier#201518Abutment report: backfill earth pressure (normal, vertical) in foundation design loads, etc.692006-12-20
Sign in to ask