Structural calculation report output error
- 교대 구조계산서 <해석결과 요약표> 필요 철근량(Req. As)과 단면검토시 <철근량 산정> 에 필요 철근량이 서로 상이 합니다. 검토후 답변 바랍니다......
Answer
안녕하세요. 한길아이티입니다. <해석결과 요약표> 필요 철근량(Req. As)는 단면검토시 Req. As외에 철근비에 의한 값입니다. 예로 흉벽 계산시 Req. As=1774.875 , 철근비검토시 4/3 Req. As=2367.0 이므로 결과요약에는 2367.0으로 표현되는것입니다. 실제로 필요한 철근량은 철근비 검토시의 양이기 때문에 2367.0으로 표기한것입니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #201337 | Please check | 61 | 2006-12-08 |
| Answered | AAbutPier | #201350 | Wing wall reinforcement detailing | 72 | 2006-12-07 |
| Answered | AAbutPier | #201325 | Pc check in slender column check | 74 | 2006-12-07 |
| Answered | AAbutPier | #201323 | Question about a skewed bridge | 68 | 2006-12-07 |
| Answered | AAbutPier | #201322 | Input data | 39 | 2006-12-07 |
| Answered | AAbutPier | #201336 | Curved and skewed bridge | 77 | 2006-12-07 |
| Answered | AAbutPier | #201324 | Question about a skewed bridge (profile and plan attached) | 56 | 2006-12-07 |
| Answered | AAbutPier | #201320 | Please review | 36 | 2006-12-07 |
| Answered | AAbutPier | #201319 | Bearing capacity check and abutment temperature rebar | 49 | 2006-12-07 |
| Answered | AAbutPier | #201316 | Question about formwork quantity | 48 | 2006-12-07 |
| Answered | AAbutPier | #201309 | Structural calculation report output error · Currently viewing | 41 | 2006-12-07 |
| Answered | AAbutPier | #201303 | Abutment wall temperature rebar | 69 | 2006-12-07 |
| Answered | AAbutPier | #201297 | Abutment section drawing error | 53 | 2006-12-06 |
| Answered | AAbutPier | #201287 | Allowable stress of piles | 62 | 2006-12-06 |
| Answered | AAbutPier | #201307 | P-M interaction diagram | 68 | 2006-12-06 |
| Answered | AAbutPier | #201302 | "Apply same" and "Apply same to current item" | 64 | 2006-12-06 |
| Answered | AAbutPier | #201278 | Drawing generation error | 51 | 2006-12-05 |
| Answered | AAbutPier | #201270 | Pier cap reinforcement | 56 | 2006-12-05 |
| Answered | AAbutPier | #201276 | Approach slab design | 52 | 2006-12-04 |
| Answered | AAbutPier | #201267 | When checking the parapet wall | 49 | 2006-12-04 |