Applying two-layer ties in the foundation
교각2에서 기초부 띠철근 2단이 적용이 안되네요 교각1과 동일하게 적용하려고 합니다.. 검토부탁드립니다..
Answer
안녕하세요. 한길아이티입니다. 교각기둥부 띠철근배치에서 BI입력에서 "구간"->"1구간"을 입력하시면 기초부에 띠철근 내측도 입력하실수 있읍니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #201257 | Seismic analysis section | 40 | 2006-12-02 |
| Answered | AAbutPier | #201250 | A few questions | 48 | 2006-12-01 |
| Answered | AAbutPier | #201248 | Problem with seismic analysis | 54 | 2006-12-01 |
| Answered | AAbutPier | #201242 | Problem with seismic analysis results | 86 | 2006-12-01 |
| Answered | AAbutPier | #201243 | Please recheck pile reactions | 82 | 2006-11-30 |
| Answered | AAbutPier | #201235 | Can the coping be skewed in the longitudinal direction? | 89 | 2006-11-30 |
| Answered | AAbutPier | #201231 | Please check my file | 58 | 2006-11-30 |
| Answered | AAbutPier | #201227 | About quantity calculation options | 88 | 2006-11-29 |
| Answered | AAbutPier | #201223 | Bridge bearing design inquiry | 82 | 2006-11-29 |
| Answered | AAbutPier | #201214 | Please fix modeling error in seismic analysis modeling | 78 | 2006-11-28 |
| Answered | AAbutPier | #201195 | Applying two-layer ties in the foundation · Currently viewing | 77 | 2006-11-27 |
| Answered | AAbutPier | #201208 | When entering alignment | 98 | 2006-11-27 |
| Answered | AAbutPier | #201202 | Joint check | 73 | 2006-11-27 |
| Answered | AAbutPier | #201199 | Calculation report check | 70 | 2006-11-27 |
| Answered | AAbutPier | #201191 | Shoe positions overlap the superstructure or are too far apart | 73 | 2006-11-27 |
| Answered | AAbutPier | #201184 | I want the bearing center to match the coping center | 77 | 2006-11-25 |
| Answered | AAbutPier | #201178 | Pier calculation report check | 96 | 2006-11-24 |
| Answered | AAbutPier | #201182 | About seismic analysis | 71 | 2006-11-24 |
| Answered | AAbutPier | #201180 | Reinforcement detailing for widened foundation | 72 | 2006-11-24 |
| Answered | AAbutPier | #201168 | Checking design elevation at abutment start point | 57 | 2006-11-24 |