AnsweredAAbutPierQ&A #2010372006-11-14 00:50 · Views 34

Two-layer main rebar in abutment wing walls

안녕하세요? 첨부하여 드린 파일의 부산방향 종점부 우측 날개벽 "C"구간을 2단 배근하려 하는데, 산출 도면상에서 2단 배근 되지 않아 문의드립니다. 확인 부탁드리겠습니다.

Answer

안녕하세요. 한길아이티입니다. 주철근입력-우측날개벽에서 권고안을 누르신후 다시 철근입력을 하시면 2단철근이 생성이 됩니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#201046Foundation reinforcement detailing and quantities442006-11-14
AnsweredAAbutPier#201043Please check my file392006-11-14
AnsweredAAbutPier#201047*** changing fonts582006-11-14
AnsweredAAbutPier#201037Two-layer main rebar in abutment wing walls · Currently viewing342006-11-14
AnsweredAAbutPier#201033Question about rebar length402006-11-13
AnsweredAAbutPier#201040When generating drawing numbers442006-11-13
AnsweredAAbutPier#201034About rebar anchorage522006-11-13
AnsweredAAbutPier#201022In the foundation stability check782006-11-13
AnsweredAAbutPier#201013In the pier design conditions652006-11-11
AnsweredAAbutPier#201011Earthwork quantity752006-11-11
AnsweredAAbutPier#200997Question on main and distribution rebar in the abutment coping under the bearing seat532006-11-10
AnsweredAAbutPier#200999Problem calculating foundation displacement722006-11-10
AnsweredAAbutPier#200991Please check the count712006-11-10
AnsweredAAbutPier#200993Please check the styrofoam quantity672006-11-10
AnsweredAAbutPier#200979Wing wall reinforcement error patch592006-11-09
AnsweredAAbutPier#200976In pile cap beam reinforcement542006-11-09
AnsweredAAbutPier#200992Two-column pier with isolated footings842006-11-09
AnsweredAAbutPier#200982Help not displaying472006-11-09
AnsweredAAbutPier#200972Error in seismic modeling analysis362006-11-09
AnsweredAAbutPier#200967Seismic application282006-11-09
Sign in to ask