AnsweredAAbutPierQ&A #2007872006-10-26 18:12 · Views 58

Pile check

말뚝허용변위 검토에서 고정일때만 검토를 하고 힌지를 고려한 두부변위 검토를 하지않아도 되는것 같습니다. 도로교 설계기준 해설(하부구조 편)-P280 참조 검토하여 주시기 바람니다. 프로그램이 모두 검토하게 되어있어 수정하기가 힘들군요

Answer

안녕하세요. 한길아이티입니다. 전화로 말씀드렸읍니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#200832Modeling error82006-11-01
AnsweredAAbutPier#200830A question out of curiosity232006-10-31
AnsweredAAbutPier#200828Please review232006-10-31
AnsweredAAbutPier#200826Import failure882006-10-31
AnsweredAAbutPier#200822Please review312006-10-31
AnsweredAAbutPier#200816Shear check of column members looks wrong522006-10-31
AnsweredAAbutPier#200808Please check the rebar material table652006-10-31
AnsweredAAbutPier#200813Trying to read a brx file422006-10-30
AnsweredAAbutPier#200811Want to exclude tank load in substructure calculation742006-10-30
AnsweredAAbutPier#200803Girder layout632006-10-30
AnsweredAAbutPier#200801Please check abutment average height in quantity calculation532006-10-30
AnsweredAAbutPier#200799Abutment wall rebar generated incorrectly472006-10-29
AnsweredAAbutPier#200798Please review802006-10-28
AnsweredAAbutPier#200794Question about wing wall reinforcement detailing432006-10-27
AnsweredAAbutPier#200791Can styrofoam be applied to the sides of the approach slab?502006-10-27
AnsweredAAbutPier#200795Please review532006-10-27
AnsweredAAbutPier#200783Main rebar layout in a skewed pier512006-10-27
AnsweredAAbutPier#200781Inquiry512006-10-27
AnsweredAAbutPier#200788About shrinkage and temperature rebar in abutment walls...802006-10-26
AnsweredAAbutPier#200787Pile check · Currently viewing582006-10-26