Question about seismic analysis
내진해석 중 단면입력의 지간길이와 가로보 설정의 지간길이가 상이한 이유를 모르겠습니다 양쪽 빔 끝단에서 450 이격한 위치에 가로보를 설치하고 중간에 하나 더 넣으려고 하는데 잘 안되네요..
Answer
안녕하세요. 한길아이티입니다. 전화로 말씀드렸읍니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #200720 | [***] Attaching APier file | 35 | 2006-10-24 |
| Answered | AAbutPier | #200716 | Two-layer foundation reinforcement... | 31 | 2006-10-23 |
| Answered | AAbutPier | #200703 | Drawings are not generated | 25 | 2006-10-23 |
| Answered | AAbutPier | #200721 | [***] Attaching dwg file | 30 | 2006-10-23 |
| Answered | AAbutPier | #200709 | About dgk file.. | 183 | 2006-10-23 |
| Answered | AAbutPier | #200700 | About wind load and centrifugal load | 34 | 2006-10-21 |
| Answered | AAbutPier | #200699 | Bridge centerline EL in front view appears outside the structure | 25 | 2006-10-21 |
| Answered | AAbutPier | #200692 | Follow-up on my phone call | 24 | 2006-10-21 |
| Answered | AAbutPier | #200691 | Shear force value error in deep beam design | 29 | 2006-10-21 |
| Answered | AAbutPier | #200689 | Basis for edge distance calculation | 24 | 2006-10-20 |
| Answered | AAbutPier | #200698 | Calculation report only | 17 | 2006-10-20 |
| Answered | AAbutPier | #200694 | Goryeong Bridge 2 | 27 | 2006-10-20 |
| Answered | AAbutPier | #200686 | [Urgent] Please check quantity calculation report error | 25 | 2006-10-20 |
| Answered | AAbutPier | #200679 | General quantities | 41 | 2006-10-19 |
| Answered | AAbutPier | #200676 | About foundation calculation | 39 | 2006-10-19 |
| Answered | AAbutPier | #200666 | Question about seismic analysis · Currently viewing | 9 | 2006-10-19 |
| Answered | AAbutPier | #200656 | Why can't wing wall rebar be detailed? | 54 | 2006-10-18 |
| Answered | AAbutPier | #200672 | Support | 26 | 2006-10-18 |
| Answered | AAbutPier | #200671 | Question about importing BRX files | 28 | 2006-10-18 |
| Answered | AAbutPier | #200663 | Can two pier files be merged? | 27 | 2006-10-18 |