Question about pier input
주변여건상 표준적인 교각 모델링이 안되는 조건임니다. 1. 교각 1에서 트랙형에서 기둥이68도정도 회전된 상태이면 교각 측면부 코핑을 도면처럼 직선으로 내려 모델링 하고 싶습니다. 2. 교각2는 아직 모델링을 해보지 않았습니다. 3. 도면(교각1,2)화일 1개, 교각1모델링 화일 1개 ------ 교각 1과 2를 apier에서 최대한 도면과 근접하게 모델링하여 수정사항을 적게 만들고 싶습니다. 어떻게하면 수정사항(도면,계산서,수량)적게할수 있을가요 tip을 알려주시면 감사하겠습니다. [개인정보] [개인정보]
Answer
안녕하세요. 한길아이티입니다. 전화로 말씀드렸읍니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #200655 | Mild and high-strength steel not distinguished when generating abutment structural drawings | 28 | 2006-10-18 |
| Answered | AAbutPier | #200654 | Abutment main rebar detailing error | 23 | 2006-10-18 |
| Answered | AAbutPier | #200650 | Drawing generation error | 48 | 2006-10-18 |
| Answered | AAbutPier | #200648 | Question about rebar details (file attached) | 29 | 2006-10-18 |
| Answered | AAbutPier | #200638 | About direction of centrifugal load | 43 | 2006-10-17 |
| Answered | AAbutPier | #200637 | Shoe block | 36 | 2006-10-17 |
| Answered | AAbutPier | #200634 | Question about pier tie bars | 32 | 2006-10-17 |
| Answered | AAbutPier | #200640 | About centrifugal load | 35 | 2006-10-17 |
| Answered | AAbutPier | #200639 | Temperature rebar in abutment wall | 47 | 2006-10-17 |
| Answered | AAbutPier | #200633 | Question about rebar arrangement in cast-in-place piles | 34 | 2006-10-17 |
| Answered | AAbutPier | #200625 | Question about pier input · Currently viewing | 34 | 2006-10-16 |
| Answered | AAbutPier | #200617 | File review (urgent) | 26 | 2006-10-14 |
| Answered | AAbutPier | #200615 | Error when checking pier pile stress | 26 | 2006-10-14 |
| Answered | AAbutPier | #200610 | Applying temperature load at fixed end | 50 | 2006-10-13 |
| Answered | AAbutPier | #200609 | Error occurs in pier calculation | 26 | 2006-10-13 |
| Answered | AAbutPier | #200618 | Checking distribution rebar ratio of wing wall | 35 | 2006-10-13 |
| Answered | AAbutPier | #200601 | [Suggestion] Please add a table of contents page to AAbutPier reports | 35 | 2006-10-13 |
| Answered | AAbutPier | #200596 | Follow-up on my phone call, please review | 25 | 2006-10-13 |
| Answered | AAbutPier | #200599 | Cross beam settings in seismic analysis | 20 | 2006-10-12 |
| Answered | AAbutPier | #200586 | Section input for seismic analysis | 37 | 2006-10-12 |