Earthwork calculation basis

수고하십니다. 토공수량산출서에서 산출근거가 교각 1개소만 출력됨니다. 검토부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 설계교각입력에서 교각명을 P,P2을 입력하시면 출력이 됩니다. >

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#200196Below is the Aline data312006-09-16
AnsweredAAbutPier#200195Aline data applied to APier and the APier data202006-09-16
AnsweredAAbutPier#200179Earthwork calculation basis · Currently viewing312006-09-15
AnsweredAAbutPier#200172Reinforcement detailing after adding abutment sections292006-09-15
AnsweredAAbutPier#200169Seismic feature still not working292006-09-15
AnsweredAAbutPier#200166Entering bearing seat dimensions182006-09-15
AnsweredAAbutPier#200180Aline alignment data262006-09-15
AnsweredAAbutPier#200162Seismic issue (BRX file)152006-09-15
AnsweredAAbutPier#200160Multi-column pier with individual footings142006-09-15
AnsweredAAbutPier#200154Seismic with ARoad integration2152006-09-15
AnsweredAAbutPier#200143About ARoad integration302006-09-14
AnsweredAAbutPier#200140Please review the file222006-09-14
AnsweredAAbutPier#200139Section determination152006-09-14
AnsweredAAbutPier#200153When entering berms2082006-09-14
AnsweredAAbutPier#200150Inquiry202006-09-14
AnsweredAAbutPier#200141Integration with BeamDeck242006-09-14
AnsweredAAbutPier#200137About seismic modeling352006-09-14
AnsweredAAbutPier#200138Seismic section input182006-09-13
AnsweredAAbutPier#200134Coping reinforcement detailing for multi-column pier with individual footings262006-09-13
AnsweredAAbutPier#200129Quantity calculation error152006-09-13
Sign in to ask