AnsweredAAbutPierQ&A #2001342006-09-13 17:06 · Views 26

Coping reinforcement detailing for multi-column pier with individual footings

개별기초가 적용된 다주식 교각의 경우 코핑부 배근이 apier상에서 제대로 구현 되지 않습니다. 보완 패치는 언제쯤 가능할까요?

Answer

안녕하세요. 한길아이티입니다. 수정하여 오늘까지 패치가 될것입니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#200196Below is the Aline data312006-09-16
AnsweredAAbutPier#200195Aline data applied to APier and the APier data202006-09-16
AnsweredAAbutPier#200179Earthwork calculation basis312006-09-15
AnsweredAAbutPier#200172Reinforcement detailing after adding abutment sections292006-09-15
AnsweredAAbutPier#200169Seismic feature still not working292006-09-15
AnsweredAAbutPier#200166Entering bearing seat dimensions182006-09-15
AnsweredAAbutPier#200180Aline alignment data262006-09-15
AnsweredAAbutPier#200162Seismic issue (BRX file)152006-09-15
AnsweredAAbutPier#200160Multi-column pier with individual footings142006-09-15
AnsweredAAbutPier#200154Seismic with ARoad integration2152006-09-15
AnsweredAAbutPier#200143About ARoad integration302006-09-14
AnsweredAAbutPier#200140Please review the file222006-09-14
AnsweredAAbutPier#200139Section determination152006-09-14
AnsweredAAbutPier#200153When entering berms2082006-09-14
AnsweredAAbutPier#200150Inquiry202006-09-14
AnsweredAAbutPier#200141Integration with BeamDeck242006-09-14
AnsweredAAbutPier#200137About seismic modeling352006-09-14
AnsweredAAbutPier#200138Seismic section input182006-09-13
AnsweredAAbutPier#200134Coping reinforcement detailing for multi-column pier with individual footings · Currently viewing262006-09-13
AnsweredAAbutPier#200129Quantity calculation error152006-09-13
Sign in to ask