Error during pier foundation reinforcement detailing
첨부한 화남교의 교각의 기초두께가 2.5m 와 2.0m의 종류가 있는데 2.5m의 교각의 대부분이라 배근을 하고 모든 교각적용을 하였습니다. 그 후 2.0m(P2)의 배근을 하려고 하는데 주철근의 측면길이가 2.5m에 고정되어 있어 변경이 안됩니다. 권고안 및 기초의 두께를 변경시켜도 보았으나 잘 되지 않아 문의 드립니다. 전화는 [개인정보]로 부탁드립니다.
Answer
안녕하세요. 한길아이티입니다. 전화로 말씀드렸읍니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #199864 | Please review | 20 | 2006-08-31 |
| Answered | AAbutPier | #199861 | Wind load applied to columns in SAP data check | 24 | 2006-08-31 |
| Answered | AAbutPier | #199858 | General drawing output issue for each pier with variable-section mass | 14 | 2006-08-31 |
| Answered | AAbutPier | #199871 | [Urgent] How do I find the negative reaction (uplift) on piles? | 16 | 2006-08-31 |
| Answered | AAbutPier | #199855 | Check for hollow pier reinforcement detailing | 21 | 2006-08-31 |
| Answered | AAbutPier | #199850 | Slope treatment of bearing seats at piers | 8 | 2006-08-30 |
| Answered | AAbutPier | #199849 | Span length for wind load distribution | 29 | 2006-08-30 |
| Answered | AAbutPier | #199845 | Error during pier foundation reinforcement detailing · Currently viewing | 16 | 2006-08-30 |
| Answered | AAbutPier | #199843 | Wall-type pier | 18 | 2006-08-30 |
| Answered | AAbutPier | #199847 | Mass step in abutment foundation | 33 | 2006-08-30 |
| Answered | AAbutPier | #199842 | Pier pile layout | 20 | 2006-08-30 |
| Answered | AAbutPier | #199839 | Calculation report is not output | 15 | 2006-08-30 |
| Answered | AAbutPier | #199832 | In the drawings | 22 | 2006-08-29 |
| Answered | AAbutPier | #199827 | Please review wall-type pier | 17 | 2006-08-29 |
| Answered | AAbutPier | #199825 | Pier cap reinforcement detailing | 15 | 2006-08-29 |
| Answered | AAbutPier | #199834 | Question about chamfer installation | 21 | 2006-08-29 |
| Answered | AAbutPier | #199823 | Drawings are not output in the specified font | 13 | 2006-08-29 |
| Answered | AAbutPier | #199822 | Error when changing cross-section configuration | 12 | 2006-08-29 |
| Answered | AAbutPier | #199821 | Drawing generation error | 19 | 2006-08-29 |
| Answered | AAbutPier | #199819 | When applying pile reactions to pile foundations | 18 | 2006-08-28 |