Skip to content
AnsweredAAbutPierQ&A #1996172006-08-10 21:22 · Views 21

When will manual input of subgrade reaction coefficient be available?

지금 [개인정보] 프로젝트 수행중인데, 곧 마무리를 져야합니다. 지반반력계수넣는걸 일주일정도 걸리면 해주신다고 했는데, 한달이 지나도 업데이트가 안되네요 나중에 심의 지적사항건이므로 좀 빨리해주세요. 그럼 수고하세요.

Answer

안녕하세요. 한길아이티입니다. 전화로 말씀드렸습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#199638[Personal info] About pier122006-08-11
AnsweredAAbutPier#199636Virtual reinforced concrete section for piles352006-08-11
AnsweredAAbutPier#199635Questions on column design242006-08-11
AnsweredAAbutPier#199626Calculation report output82006-08-11
AnsweredAAbutPier#199623Calculation report for subgrade reaction coefficient362006-08-11
AnsweredAAbutPier#199621Question about braking and starting load352006-08-11
AnsweredAAbutPier#1996206. Column design282006-08-11
AnsweredAAbutPier#199618Question about couplers332006-08-11
AnsweredAAbutPier#199616Direction marks missing in pier reinforcement drawing332006-08-11
AnsweredAAbutPier#199614Applying seismic load412006-08-11
AnsweredAAbutPier#199605Pier structural calculation192006-08-11
AnsweredAAbutPier#199598Abutment bearing seat step option162006-08-10
AnsweredAAbutPier#199597Inquiry about AAbutPier342006-08-10
AnsweredAAbutPier#199617When will manual input of subgrade reaction coefficient be available? · Currently viewing212006-08-10
AnsweredAAbutPier#199596Seismic analysis inquiry132006-08-10
AnsweredAAbutPier#199615Braking and starting load692006-08-10
AnsweredAAbutPier#199609Centrifugal load522006-08-10
AnsweredAAbutPier#199607Pier structural calculation report check732006-08-10
AnsweredAAbutPier#199606When the slenderness ratio exceeds 100132006-08-10
AnsweredAAbutPier#199599Buoyancy check for submerged pier152006-08-10
Sign in to ask