Pier structural calculation report check
1. 기초 유효폭 산정 계산의 삭제 메뉴는 어디에 있는지요. (기초 강체 검토시 기초 유효폭 산정 삭제) 2.교각1 구조계산에서 교량 받침 연단거리 검토에서 경간길이가 35m로 나옴 중간경간 45m로 적용이 않됨 3. 교각1 구조계산서에서 교량 받침하면 보강에서 L값이 0으로 나옴 45.0m로 나와야 됨
Answer
안녕하세요. 한길아이티입니다. 1.교각설계환경-설계선택사항에 옵션이 되어있읍니다. 2.오늘자 패치에 적용하겠읍니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #199638 | [Personal info] About pier | 12 | 2006-08-11 |
| Answered | AAbutPier | #199636 | Virtual reinforced concrete section for piles | 35 | 2006-08-11 |
| Answered | AAbutPier | #199635 | Questions on column design | 24 | 2006-08-11 |
| Answered | AAbutPier | #199626 | Calculation report output | 8 | 2006-08-11 |
| Answered | AAbutPier | #199623 | Calculation report for subgrade reaction coefficient | 36 | 2006-08-11 |
| Answered | AAbutPier | #199621 | Question about braking and starting load | 35 | 2006-08-11 |
| Answered | AAbutPier | #199620 | 6. Column design | 28 | 2006-08-11 |
| Answered | AAbutPier | #199618 | Question about couplers | 33 | 2006-08-11 |
| Answered | AAbutPier | #199616 | Direction marks missing in pier reinforcement drawing | 33 | 2006-08-11 |
| Answered | AAbutPier | #199614 | Applying seismic load | 41 | 2006-08-11 |
| Answered | AAbutPier | #199605 | Pier structural calculation | 19 | 2006-08-11 |
| Answered | AAbutPier | #199598 | Abutment bearing seat step option | 16 | 2006-08-10 |
| Answered | AAbutPier | #199597 | Inquiry about AAbutPier | 34 | 2006-08-10 |
| Answered | AAbutPier | #199617 | When will manual input of subgrade reaction coefficient be available? | 21 | 2006-08-10 |
| Answered | AAbutPier | #199596 | Seismic analysis inquiry | 13 | 2006-08-10 |
| Answered | AAbutPier | #199615 | Braking and starting load | 69 | 2006-08-10 |
| Answered | AAbutPier | #199609 | Centrifugal load | 52 | 2006-08-10 |
| Answered | AAbutPier | #199607 | Pier structural calculation report check · Currently viewing | 73 | 2006-08-10 |
| Answered | AAbutPier | #199606 | When the slenderness ratio exceeds 100 | 13 | 2006-08-10 |
| Answered | AAbutPier | #199599 | Buoyancy check for submerged pier | 15 | 2006-08-10 |