Skip to content
AnsweredAAbutPierQ&A #1994052006-07-26 02:34 · Views 19

Bottom rebar spacing of abutment foundation

교대기초 하면 철근 간격을 C.T.C250으로 하고 싶은데 잘 안됩니다. 파일을 올리니 부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 수정하였습니다. 금일 저녁 패치에 반영될 예정입니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#199421Error message302006-07-27
AnsweredAAbutPier#199422Patch error?332006-07-26
AnsweredAAbutPier#199412# symbols are displayed192006-07-26
AnsweredAAbutPier#199411Cannot check coping midspan of multi-column pier112006-07-26
AnsweredAAbutPier#199415About the pier reinforcement drawing182006-07-26
AnsweredAAbutPier#199405Bottom rebar spacing of abutment foundation · Currently viewing192006-07-26
AnsweredAAbutPier#199402File will not open212006-07-26
AnsweredAAbutPier#199407Cannot enter bearing seat dimensions172006-07-25
AnsweredAAbutPier#199401Please recheck the distribution rebar provisions182006-07-25
AnsweredAAbutPier#199385Error in abutment main rebar input222006-07-25
AnsweredAAbutPier#199394Crosstie layout in columns182006-07-24
AnsweredAAbutPier#199384Please check outer wall rebar quantity122006-07-24
AnsweredAAbutPier#199383Bearing seat error122006-07-24
AnsweredAAbutPier#199378Maximum pile bending stress differs between drawing and structural calculation232006-07-22
AnsweredAAbutPier#199374Bridge bearing rebar quantities differ242006-07-22
AnsweredAAbutPier#199373Wing wall rebar issue222006-07-22
AnsweredAAbutPier#199372Uploading file192006-07-21
AnsweredAAbutPier#199363Bearing seat step option172006-07-21
AnsweredAAbutPier#199371About effective section area472006-07-21
AnsweredAAbutPier#199367Horizontal seismic force in single-span bridge602006-07-21
Sign in to ask