Skip to content
AnsweredAAbutPierQ&A #1986872006-05-10 00:59 · Views 75

Pier reinforcement drawing: cap beam

교각 배근도가 제대로 표시되지 않네요. 확인바랍니다. [개인정보]

Answer

안녕하세요. 한길아이티입니다. 캔틸레버부 하단에 헌치가 없는 경우에는 HL1과 HL2가 0(zero)으로 입력되야합니다. HL1 = 0 CL1 = 1.994+0.6=2.594 HL2 = 0 이렇게 입력하시면 원하시는 결과를 얻을 수 있습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#198694Cannot adjust abutment bearing position742006-05-10
AnsweredAAbutPier#198689About the bearing seat dimension input field472006-05-10
AnsweredAAbutPier#198687Pier reinforcement drawing: cap beam · Currently viewing752006-05-10
AnsweredAAbutPier#198684Please review632006-05-09
AnsweredAAbutPier#198682About internal forces732006-05-09
AnsweredAAbutPier#198693Question about haunch at pier foundation642006-05-09
AnsweredAAbutPier#198675Program582006-05-08
AnsweredAAbutPier#198670Pier rebar details502006-05-08
AnsweredAAbutPier#198667Foundation distribution rebar632006-05-07
AnsweredAAbutPier#198660Inquiry1042006-05-05
AnsweredAAbutPier#198654Bearing seat input error672006-05-04
AnsweredAAbutPier#198652Hook reinforcement detail error in drawing output1182006-05-04
AnsweredAAbutPier#198659Shear shape factor of piles4412006-05-04
AnsweredAAbutPier#198653Hook reinforcement detail error in drawing output762006-05-04
AnsweredAAbutPier#198647About the pot bearing642006-05-04
AnsweredAAbutPier#198643About the bearing pedestal682006-05-03
AnsweredAAbutPier#198633Please generate the earthwork report once more612006-05-02
AnsweredAAbutPier#198639About drawing output762006-05-02
AnsweredAAbutPier#198638Inquiry642006-05-02
AnsweredAAbutPier#198635Patterned formwork quantity for wall front not reflected in quantity report902006-05-02
Sign in to ask