About seismic design
PSC빔과 PF빔으로 이루어진 교량입니다. PSC빔은 5개, PF빔은 6개로 되어 있습니다. 내진 해석 결과 종점부 교대와 P2부분에서 수평력이 과다하게 나오는것 같습니다. 교좌장치는 고력황동 스페리칼받침(에스코)을 적용. 모델링에 대한 검토를 좀 부탁드립니다.
Answer
안녕하세요. 한길아이티입니다. 전화로 말씀드렸습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #198629 | Multi-column pier | 100 | 2006-05-02 |
| Answered | AAbutPier | #198626 | Urgent request | 97 | 2006-05-02 |
| Answered | AAbutPier | #198621 | Error in seismic analysis | 125 | 2006-05-01 |
| Answered | AAbutPier | #198616 | Cannot control pile horizontal displacement | 130 | 2006-04-29 |
| Answered | AAbutPier | #198615 | Modeling error message | 83 | 2006-04-29 |
| Answered | AAbutPier | #198613 | Splice length and development length | 108 | 2006-04-29 |
| Answered | AAbutPier | #198617 | Foundation section check | 116 | 2006-04-28 |
| Answered | AAbutPier | #198603 | Displacement at top of column | 91 | 2006-04-28 |
| Answered | AAbutPier | #198602 | Section force error | 89 | 2006-04-28 |
| Answered | AAbutPier | #198601 | Question | 90 | 2006-04-28 |
| Answered | AAbutPier | #198595 | Pier check: calculating long-welded-rail longitudinal load and traction/braking load | 126 | 2006-04-27 |
| Answered | AAbutPier | #198594 | Requesting a quick reply | 64 | 2006-04-27 |
| Answered | AAbutPier | #198593 | Seismic analysis results | 83 | 2006-04-27 |
| Answered | AAbutPier | #198583 | Bearings have been swapped | 102 | 2006-04-27 |
| Answered | AAbutPier | #198579 | Cover for cast-in-place piles | 40 | 2006-04-26 |
| Answered | AAbutPier | #198575 | File no. 2 designed today | 78 | 2006-04-26 |
| Answered | AAbutPier | #198574 | File no. 1 from my phone inquiry | 78 | 2006-04-26 |
| Answered | AAbutPier | #198573 | About seismic design · Currently viewing | 118 | 2006-04-26 |
| Answered | AAbutPier | #198572 | Calculation report: seismic force | 61 | 2006-04-25 |
| Answered | AAbutPier | #198569 | Shear check section, file attached | 71 | 2006-04-25 |