Pier general drawing

이런 교각 일반도 작도가 가능한지요

Answer

안녕하세요. 한길아이티입니다. 보내주신 단면의 경우 현재 적용이 되지않는 단면입니다. 두부보의 형태로 보아 향후에도 지원하기는 힘든 타입으로 판단이 됩니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#198283Expansion gap at abutment792006-04-03
AnsweredAAbutPier#198274Internal program error942006-04-01
AnsweredAAbutPier#198273Missing rebar placement at bearing seat1122006-04-01
AnsweredAAbutPier#198272Quantity calculation report972006-03-31
AnsweredAAbutPier#198262Comparison data482006-03-30
AnsweredAAbutPier#198270Concrete strength1782006-03-30
AnsweredAAbutPier#198256Calculation report output822006-03-30
AnsweredAAbutPier#198255Difference between beam and slab ends452006-03-30
AnsweredAAbutPier#198250Calculation report for double track502006-03-29
AnsweredAAbutPier#198240About SIP piles1212006-03-29
AnsweredAAbutPier#198234Drawing output652006-03-28
AnsweredAAbutPier#198231Question about wing wall rebar712006-03-28
AnsweredAAbutPier#198230Text size in drawing output1092006-03-28
AnsweredAAbutPier#198221Please check622006-03-27
AnsweredAAbutPier#198215About temperature load calculation882006-03-27
AnsweredAAbutPier#198229About column shear design772006-03-27
AnsweredAAbutPier#198223Pier general drawing · Currently viewing1182006-03-27
AnsweredAAbutPier#198212Follow-up question on bridge bearing design file below922006-03-25
AnsweredAAbutPier#198207Pile length at abutment1002006-03-25
AnsweredAAbutPier#198206Please review1092006-03-25
Sign in to ask