Skip to content
AnsweredAAbutPierQ&A #1980142006-03-11 00:23 · Views 84

Please check

교대 벽체와 뒷굽에 2단 주철근 배치시 배력근 입력 방법이 궁금합니다.

Answer

안녕하세요. 한길아이티입니다. 주철근 입력텝과 배력근입력텝에서 입력하시면 됩니다. 자세한 사항은 전화로 말씀드렸습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#198027Pier column shear check and foundation error652006-03-14
AnsweredAAbutPier#198028Question about retaining walls572006-03-13
AnsweredAAbutPier#198024Distance from parapet front face to bearing center1202006-03-13
AnsweredAAbutPier#198020Please check272006-03-11
AnsweredAAbutPier#198014Please check · Currently viewing842006-03-11
AnsweredAAbutPier#198007Main rebar in tapered coping section872006-03-10
AnsweredAAbutPier#198006Skew at coping1052006-03-10
AnsweredAAbutPier#198010The file you sent862006-03-10
AnsweredAAbutPier#198003Application error during pier section check872006-03-10
AnsweredAAbutPier#198002Abutment section looks wrong after adding one girder to a PSC girder bridge942006-03-10
AnsweredAAbutPier#198000Please check error in wing wall check992006-03-10
AnsweredAAbutPier#197998Slab width when entering slab dimensions902006-03-10
AnsweredAAbutPier#197995Rebar displays incorrectly in wing wall drawing562006-03-10
AnsweredAAbutPier#197988Drawing error..802006-03-09
AnsweredAAbutPier#197986Error in critical section location illustration...972006-03-09
AnsweredAAbutPier#197984Output problem1232006-03-09
AnsweredAAbutPier#197993Request602006-03-09
AnsweredAAbutPier#197983Reinforcement drawing for the connection pier1052006-03-09
AnsweredAAbutPier#197980Column shear check922006-03-08
AnsweredAAbutPier#197982About local coordinates312006-03-08
Sign in to ask