Main rebar in tapered coping section
선형진향방향쪽으로 변단면이 존재하여 이 두가지 단면에 관하여 주철근을 배근하여야 하느데 아래쪽 단면만 검토가 됩니다. 검토 부탁드립니다.
Answer
안녕하세요. 한길아이티입니다. 전화로 말씀드렸습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #198027 | Pier column shear check and foundation error | 65 | 2006-03-14 |
| Answered | AAbutPier | #198028 | Question about retaining walls | 57 | 2006-03-13 |
| Answered | AAbutPier | #198024 | Distance from parapet front face to bearing center | 120 | 2006-03-13 |
| Answered | AAbutPier | #198020 | Please check | 27 | 2006-03-11 |
| Answered | AAbutPier | #198014 | Please check | 84 | 2006-03-11 |
| Answered | AAbutPier | #198007 | Main rebar in tapered coping section · Currently viewing | 87 | 2006-03-10 |
| Answered | AAbutPier | #198006 | Skew at coping | 105 | 2006-03-10 |
| Answered | AAbutPier | #198010 | The file you sent | 86 | 2006-03-10 |
| Answered | AAbutPier | #198003 | Application error during pier section check | 87 | 2006-03-10 |
| Answered | AAbutPier | #198002 | Abutment section looks wrong after adding one girder to a PSC girder bridge | 94 | 2006-03-10 |
| Answered | AAbutPier | #198000 | Please check error in wing wall check | 99 | 2006-03-10 |
| Answered | AAbutPier | #197998 | Slab width when entering slab dimensions | 90 | 2006-03-10 |
| Answered | AAbutPier | #197995 | Rebar displays incorrectly in wing wall drawing | 56 | 2006-03-10 |
| Answered | AAbutPier | #197988 | Drawing error.. | 80 | 2006-03-09 |
| Answered | AAbutPier | #197986 | Error in critical section location illustration... | 97 | 2006-03-09 |
| Answered | AAbutPier | #197984 | Output problem | 123 | 2006-03-09 |
| Answered | AAbutPier | #197993 | Request | 60 | 2006-03-09 |
| Answered | AAbutPier | #197983 | Reinforcement drawing for the connection pier | 105 | 2006-03-09 |
| Answered | AAbutPier | #197980 | Column shear check | 92 | 2006-03-08 |
| Answered | AAbutPier | #197982 | About local coordinates | 31 | 2006-03-08 |