AnsweredAAbutPierQ&A #1976642006-02-13 16:31 · Views 36

Please review

안녕하십니까? 전화로 말씀드린 파일을 첨부하여 보내드립니다. 첨부한 파일에서 교대 및 교각이 [개인정보]의 진주시내방향의 교대와 교각처럼 일괄 시공되어야 하나, 교통처리 상의 문제로 [개인정보]의 교대와 교각이 먼저 시공된 후 2차 시공으로 마무리되게 되어 있습니다. 그래서 전화로 말씀드린 바와 같은 방법으로 작업할 수 있는 방법이 없는지 여쭙고자 합니다.

Answer

안녕하세요. 한길아이티입니다. 전화로 말씀드렸습니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#197688Why does this happen in main rebar reinforcement detailing?252006-02-15
AnsweredAAbutPier#197666Rectangular pier cap dimensions122006-02-14
AnsweredAAbutPier#197665Applying water pressure for flood and drought conditions322006-02-14
AnsweredAAbutPier#197648Please check the number of couplers192006-02-13
AnsweredAAbutPier#197676Why does a step occur in the design elevation in ALine?692006-02-13
AnsweredAAbutPier#197664Please review · Currently viewing362006-02-13
AnsweredAAbutPier#197656Adding dead load to a pier222006-02-13
AnsweredAAbutPier#197649Entering longitudinal ground elevations in ALine422006-02-13
AnsweredAAbutPier#197639About the seismic calculation report192006-02-13
AnsweredAAbutPier#197628Data error322006-02-11
AnsweredAAbutPier#197622About seismic modeling332006-02-10
AnsweredAAbutPier#197613Model generation error422006-02-10
AnsweredAAbutPier#197627Question242006-02-10
AnsweredAAbutPier#197625Unknown numbers in earthwork quantities112006-02-10
AnsweredAAbutPier#197616Please review seismic check612006-02-10
AnsweredAAbutPier#197605Allowable pullout force782006-02-10
AnsweredAAbutPier#197602When designing PSC beams412006-02-10
AnsweredAAbutPier#197598Please review seismic check292006-02-09
AnsweredAAbutPier#197597About pile cap beam reinforcement detailing212006-02-09
AnsweredAAbutPier#197609Question on seismic analysis of a bridge with separate up and down lines342006-02-09
Sign in to ask