Skip to content
AnsweredAAbutPierQ&A #1976252006-02-10 16:27 · Views 11

Unknown numbers in earthwork quantities

토공수량 에서 앞성토의 구조물 공제에서 이해가 잘 안되는 숫자가 있어서 그러니 검토부탁드립니다 9.266 빨간색 셀 확인해주세요

Answer

안녕하세요. 한길아이티입니다. 말씀하신 오류는 확인 하였습니다. 수정해서 금일자 패치에 반영하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#197688Why does this happen in main rebar reinforcement detailing?252006-02-15
AnsweredAAbutPier#197666Rectangular pier cap dimensions122006-02-14
AnsweredAAbutPier#197665Applying water pressure for flood and drought conditions322006-02-14
AnsweredAAbutPier#197648Please check the number of couplers192006-02-13
AnsweredAAbutPier#197676Why does a step occur in the design elevation in ALine?692006-02-13
AnsweredAAbutPier#197664Please review362006-02-13
AnsweredAAbutPier#197656Adding dead load to a pier222006-02-13
AnsweredAAbutPier#197649Entering longitudinal ground elevations in ALine422006-02-13
AnsweredAAbutPier#197639About the seismic calculation report192006-02-13
AnsweredAAbutPier#197628Data error322006-02-11
AnsweredAAbutPier#197622About seismic modeling332006-02-10
AnsweredAAbutPier#197613Model generation error422006-02-10
AnsweredAAbutPier#197627Question242006-02-10
AnsweredAAbutPier#197625Unknown numbers in earthwork quantities · Currently viewing112006-02-10
AnsweredAAbutPier#197616Please review seismic check612006-02-10
AnsweredAAbutPier#197605Allowable pullout force782006-02-10
AnsweredAAbutPier#197602When designing PSC beams412006-02-10
AnsweredAAbutPier#197598Please review seismic check292006-02-09
AnsweredAAbutPier#197597About pile cap beam reinforcement detailing212006-02-09
AnsweredAAbutPier#197609Question on seismic analysis of a bridge with separate up and down lines342006-02-09
Sign in to ask