Skip to content
AnsweredAAbutPierQ&A #1976022006-02-10 00:01 · Views 41

When designing PSC beams

수고하십니다. psc빔 설계시 종곡선및 편경사에 따른 빔상단 몰탈이 적용되지 않고 슬래브 두께로 하여 산출되어지는것 같은데요 elevation산출근거도 작성시 입니다. 그리고 그 슬래브 두께가 몰탈까지 적용되어진다하더라도 그값이 조금상이한데 검토부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 말씀하신 바와 같이 종곡선 및 편경사에 따른 상단 몰탈은 슬래브 두께로 포함하여 산출되고 있습니다. ELVATION산출근거도에서 슬래브두께가 263mm로 산출된 것은 슬래브 두께 250mm와 편구배에 따른 두께 13mm가 산정이 된 값입니다. (빔의 폭이 900mm이므로 900/2 x 2.896% = 13.032mm) 검토하신 상이한 부분을 구체적으로 적어주시면 추가로 검토후에 답변드리겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#197688Why does this happen in main rebar reinforcement detailing?252006-02-15
AnsweredAAbutPier#197666Rectangular pier cap dimensions122006-02-14
AnsweredAAbutPier#197665Applying water pressure for flood and drought conditions322006-02-14
AnsweredAAbutPier#197648Please check the number of couplers192006-02-13
AnsweredAAbutPier#197676Why does a step occur in the design elevation in ALine?692006-02-13
AnsweredAAbutPier#197664Please review362006-02-13
AnsweredAAbutPier#197656Adding dead load to a pier222006-02-13
AnsweredAAbutPier#197649Entering longitudinal ground elevations in ALine422006-02-13
AnsweredAAbutPier#197639About the seismic calculation report192006-02-13
AnsweredAAbutPier#197628Data error322006-02-11
AnsweredAAbutPier#197622About seismic modeling332006-02-10
AnsweredAAbutPier#197613Model generation error422006-02-10
AnsweredAAbutPier#197627Question242006-02-10
AnsweredAAbutPier#197625Unknown numbers in earthwork quantities112006-02-10
AnsweredAAbutPier#197616Please review seismic check612006-02-10
AnsweredAAbutPier#197605Allowable pullout force782006-02-10
AnsweredAAbutPier#197602When designing PSC beams · Currently viewing412006-02-10
AnsweredAAbutPier#197598Please review seismic check292006-02-09
AnsweredAAbutPier#197597About pile cap beam reinforcement detailing212006-02-09
AnsweredAAbutPier#197609Question on seismic analysis of a bridge with separate up and down lines342006-02-09
Sign in to ask