Skip to content
AnsweredAAbutPierQ&A #1975972006-02-09 19:34 · Views 21

About pile cap beam reinforcement detailing

두부보 배근에서 보강철근이 주철근 2단과 3단에 배치가 잘안돼고 있습니다. input data를 첨부합니다. 확인부탁드립니다. tel)[개인정보]

Answer

안녕하세요. 한길아이티입니다. 답변이 늦어 죄송합니다. 말씀하신 사항은 확인하였으며 보완하여 금일자 패치에 적용하도록 하겠습니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#197688Why does this happen in main rebar reinforcement detailing?252006-02-15
AnsweredAAbutPier#197666Rectangular pier cap dimensions122006-02-14
AnsweredAAbutPier#197665Applying water pressure for flood and drought conditions322006-02-14
AnsweredAAbutPier#197648Please check the number of couplers192006-02-13
AnsweredAAbutPier#197676Why does a step occur in the design elevation in ALine?692006-02-13
AnsweredAAbutPier#197664Please review362006-02-13
AnsweredAAbutPier#197656Adding dead load to a pier222006-02-13
AnsweredAAbutPier#197649Entering longitudinal ground elevations in ALine422006-02-13
AnsweredAAbutPier#197639About the seismic calculation report192006-02-13
AnsweredAAbutPier#197628Data error322006-02-11
AnsweredAAbutPier#197622About seismic modeling332006-02-10
AnsweredAAbutPier#197613Model generation error422006-02-10
AnsweredAAbutPier#197627Question242006-02-10
AnsweredAAbutPier#197625Unknown numbers in earthwork quantities112006-02-10
AnsweredAAbutPier#197616Please review seismic check612006-02-10
AnsweredAAbutPier#197605Allowable pullout force782006-02-10
AnsweredAAbutPier#197602When designing PSC beams412006-02-10
AnsweredAAbutPier#197598Please review seismic check292006-02-09
AnsweredAAbutPier#197597About pile cap beam reinforcement detailing · Currently viewing212006-02-09
AnsweredAAbutPier#197609Question on seismic analysis of a bridge with separate up and down lines342006-02-09
Sign in to ask