About the approach slab
콘크리트 포장용 접속슬래브를 사용할 경우 fck=270kgf/cm2 의 콘크리트와 H-bar를 사용하게 되는데요... 이음장이 발생할 경우... D-bar의 겹이음 길이로 산출됩니다. 추가로... 첨부파일의 접속슬래브 도면에서 8번철근의 갯수가 좀 많이 산출되는듯한데... 검토부탁드립니다. 감사합니다.
Answer
안녕하세요. 한길아이티입니다. 말씀하신 사항은 확인하였습니다. 수정하여 금일자 패치에 적용하도록 하겠습니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #196741 | Please review | 12 | 2005-12-13 |
| Answered | AAbutPier | #196737 | About pier reinforcement detailing | 16 | 2005-12-13 |
| Answered | AAbutPier | #196736 | Inquiry about seismic analysis modeling error | 10 | 2005-12-13 |
| Answered | AAbutPier | #196735 | Abutment reinforcement drawing | 11 | 2005-12-13 |
| Answered | AAbutPier | #196730 | Modeling when running seismic analysis | 13 | 2005-12-13 |
| Answered | AAbutPier | #196731 | About rebar reinforcement detailing | 13 | 2005-12-13 |
| Answered | AAbutPier | #196726 | In seismic analysis | 6 | 2005-12-13 |
| Answered | AAbutPier | #196723 | Question about main rebar in railway bridge abutment foundation | 5 | 2005-12-13 |
| Answered | AAbutPier | #196717 | Abutment ELEVATION | 17 | 2005-12-13 |
| Answered | AAbutPier | #196716 | About column moment magnification | 53 | 2005-12-13 |
| Answered | AAbutPier | #196715 | About the approach slab · Currently viewing | 19 | 2005-12-13 |
| Answered | AAbutPier | #196713 | Error generating seismic input data | 10 | 2005-12-12 |
| Answered | AAbutPier | #196707 | Reinforcement drawing error | 13 | 2005-12-12 |
| Answered | AAbutPier | #196706 | Please check rebar spacing on the buffer slab drawing | 11 | 2005-12-12 |
| Answered | AAbutPier | #196694 | Seismic calculation report output error | 7 | 2005-12-09 |
| Answered | AAbutPier | #196688 | Check of distribution rebar diameter in approach slab | 9 | 2005-12-09 |
| Answered | AAbutPier | #196684 | Pile layout error | 19 | 2005-12-09 |
| Answered | AAbutPier | #196685 | Abutment wall surface finishing rebar | 23 | 2005-12-09 |
| Answered | AAbutPier | #196680 | Abutment foundation rebar detailing looks wrong | 16 | 2005-12-09 |
| Answered | AAbutPier | #196675 | Pile quantity | 11 | 2005-12-08 |