AnsweredAAbutPierQ&A #1967132005-12-12 23:55 · Views 10

Error generating seismic input data

.콘크리트 재료정의 중 mass값에 이상한 문자가..... M=2.5/9.8 --->이렇게 나와야 정상인데... M=2.5/pStd->m_gValue --> 이렇게 생성됨.. 연락부탁드립니다. [개인정보] [개인정보]

Answer

안녕하세요. 한길아이티입니다. 말씀하신 부분은 확인하였습니다. 수정하였으며 금일자 패치에 적용하도록 하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#196741Please review122005-12-13
AnsweredAAbutPier#196737About pier reinforcement detailing162005-12-13
AnsweredAAbutPier#196736Inquiry about seismic analysis modeling error102005-12-13
AnsweredAAbutPier#196735Abutment reinforcement drawing112005-12-13
AnsweredAAbutPier#196730Modeling when running seismic analysis132005-12-13
AnsweredAAbutPier#196731About rebar reinforcement detailing132005-12-13
AnsweredAAbutPier#196726In seismic analysis62005-12-13
AnsweredAAbutPier#196723Question about main rebar in railway bridge abutment foundation52005-12-13
AnsweredAAbutPier#196717Abutment ELEVATION172005-12-13
AnsweredAAbutPier#196716About column moment magnification532005-12-13
AnsweredAAbutPier#196715About the approach slab192005-12-13
AnsweredAAbutPier#196713Error generating seismic input data · Currently viewing102005-12-12
AnsweredAAbutPier#196707Reinforcement drawing error132005-12-12
AnsweredAAbutPier#196706Please check rebar spacing on the buffer slab drawing112005-12-12
AnsweredAAbutPier#196694Seismic calculation report output error72005-12-09
AnsweredAAbutPier#196688Check of distribution rebar diameter in approach slab92005-12-09
AnsweredAAbutPier#196684Pile layout error192005-12-09
AnsweredAAbutPier#196685Abutment wall surface finishing rebar232005-12-09
AnsweredAAbutPier#196680Abutment foundation rebar detailing looks wrong162005-12-09
AnsweredAAbutPier#196675Pile quantity112005-12-08
Sign in to ask