Quantity calculation error for underwater excavation
첨부화일의 경우 보령방향(A1)과 서천방향(A1)의 수량산출에서 지하수위 이하의 풍화암 터파기 산출이 안됩니다. 그리고 수중터파기의 산출근거가 이상하게 출력됩니다. 빠른답변 부탁드립니다.
Answer
안녕하세요. 한길아이티입니다. 말씀하신 사항은 확인하였습니다. 수정하여 패치에 적용하도록 하겠습니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #196668 | Cannot change the shoe capacity used | 13 | 2005-12-08 |
| Answered | AAbutPier | #196674 | Pile quantity | 8 | 2005-12-08 |
| Answered | AAbutPier | #196661 | Pile check error in pier-foundation settings | 27 | 2005-12-08 |
| Answered | AAbutPier | #196658 | Question about front embankment quantity | 90 | 2005-12-08 |
| Answered | AAbutPier | #196657 | Cast-in-place pile quantity | 41 | 2005-12-08 |
| Answered | AAbutPier | #196656 | Program crashes while generating drawings | 27 | 2005-12-08 |
| Answered | AAbutPier | #196653 | Earthwork quantity report looks wrong, please check | 22 | 2005-12-08 |
| Answered | AAbutPier | #196649 | Reinforcement detailing issue in semi-gravity abutment | 71 | 2005-12-07 |
| Answered | AAbutPier | #196660 | Inquiry about applying superelevation | 14 | 2005-12-07 |
| Answered | AAbutPier | #196659 | Please also check the abutment protection block | 23 | 2005-12-07 |
| Answered | AAbutPier | #196646 | Load changes automatically when derailment load is considered, please check | 34 | 2005-12-07 |
| Answered | AAbutPier | #196650 | Question about applying earth cover load on piers | 29 | 2005-12-07 |
| Answered | AAbutPier | #196648 | When outputting the rebar schedule... | 34 | 2005-12-07 |
| Answered | AAbutPier | #196644 | Column shear design | 27 | 2005-12-07 |
| Answered | AAbutPier | #196638 | Wing wall not generated in main rebar generation, urgent | 34 | 2005-12-07 |
| Answered | AAbutPier | #196636 | Main rebar at bottom of pier cap | 30 | 2005-12-07 |
| Answered | AAbutPier | #196631 | Quantity calculation error for underwater excavation · Currently viewing | 20 | 2005-12-07 |
| Answered | AAbutPier | #196623 | Question about T-shaped pier with longitudinal step | 31 | 2005-12-06 |
| Answered | AAbutPier | #196629 | When checking bearing capacity of spread foundation... | 33 | 2005-12-06 |
| Answered | AAbutPier | #196620 | Minimum thickness of sole plate | 25 | 2005-12-06 |