Backfill

교대벽체에서 500mm떨어져서 1 : 1로 뒤채움을 하는데. 500mm떨어지는 것을 임의로 조정이 가능한지.궁금합니다. 빠른 답변좀 분탁 드리겠습니다.

Answer

안녕하세요. 한길아이티입니다. 뒷채움시의 이격거리를 조정할 수 있는 옵션은 현재 설정이 되어있지 않습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#196562Left wing wall at end point122005-12-03
AnsweredAAbutPier#196560Drawings cannot be output82005-12-03
AnsweredAAbutPier#196549Question about calculation report172005-12-02
AnsweredAAbutPier#196556Backfill · Currently viewing142005-12-02
AnsweredAAbutPier#196554Material schedule does not run172005-12-02
AnsweredAAbutPier#196535Follow-up on phone inquiry172005-12-02
AnsweredAAbutPier#196533Ground line display at start abutment242005-12-02
AnsweredAAbutPier#196532Pier bearing seat step depending on superstructure type...312005-12-02
AnsweredAAbutPier#196531Pier tie rebar error322005-12-02
AnsweredAAbutPier#196529Foundation reinforcement drawing572005-12-02
AnsweredAAbutPier#196525Please check bridge maintenance signboard (quantity)722005-12-02
AnsweredAAbutPier#196524Application error112005-12-01
AnsweredAAbutPier#196518Question about wind load input142005-12-01
AnsweredAAbutPier#196512Steel pipe pile stress and bearing support length512005-12-01
AnsweredAAbutPier#196536Elevation step342005-12-01
AnsweredAAbutPier#196521Bridge bearing block322005-12-01
AnsweredAAbutPier#196500About drawings212005-12-01
AnsweredAAbutPier#196498Quantity report not generated; message says to contact HanGil IT152005-12-01
AnsweredAAbutPier#196494Applying levels252005-11-30
AnsweredAAbutPier#196505Abutment quantity calculation232005-11-30
Sign in to ask