Material schedule does not run
재료표가 안돌아가는데요
Answer
안녕하세요. 한길아이티입니다. Zoom 을 너무 많이 시킨 상황에서 객체 추출시 비정상적일수도 있습니다. 적당한 zoom 을 시키신후 선택하시기 바랍니다. 자세한 사항은 전화로 말씀드렸습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #196562 | Left wing wall at end point | 12 | 2005-12-03 |
| Answered | AAbutPier | #196560 | Drawings cannot be output | 8 | 2005-12-03 |
| Answered | AAbutPier | #196549 | Question about calculation report | 17 | 2005-12-02 |
| Answered | AAbutPier | #196556 | Backfill | 14 | 2005-12-02 |
| Answered | AAbutPier | #196554 | Material schedule does not run · Currently viewing | 17 | 2005-12-02 |
| Answered | AAbutPier | #196535 | Follow-up on phone inquiry | 17 | 2005-12-02 |
| Answered | AAbutPier | #196533 | Ground line display at start abutment | 24 | 2005-12-02 |
| Answered | AAbutPier | #196532 | Pier bearing seat step depending on superstructure type... | 31 | 2005-12-02 |
| Answered | AAbutPier | #196531 | Pier tie rebar error | 32 | 2005-12-02 |
| Answered | AAbutPier | #196529 | Foundation reinforcement drawing | 57 | 2005-12-02 |
| Answered | AAbutPier | #196525 | Please check bridge maintenance signboard (quantity) | 72 | 2005-12-02 |
| Answered | AAbutPier | #196524 | Application error | 11 | 2005-12-01 |
| Answered | AAbutPier | #196518 | Question about wind load input | 14 | 2005-12-01 |
| Answered | AAbutPier | #196512 | Steel pipe pile stress and bearing support length | 51 | 2005-12-01 |
| Answered | AAbutPier | #196536 | Elevation step | 34 | 2005-12-01 |
| Answered | AAbutPier | #196521 | Bridge bearing block | 32 | 2005-12-01 |
| Answered | AAbutPier | #196500 | About drawings | 21 | 2005-12-01 |
| Answered | AAbutPier | #196498 | Quantity report not generated; message says to contact HanGil IT | 15 | 2005-12-01 |
| Answered | AAbutPier | #196494 | Applying levels | 25 | 2005-11-30 |
| Answered | AAbutPier | #196505 | Abutment quantity calculation | 23 | 2005-11-30 |